Clarksville Lateral Project
From the ProvenHand pipeline wiki
Clarksville Lateral Project is a pipeline lateral, operated by Enable Gas Transmission, LLC. It runs 13 miles of 16" pipe.
| Clarksville Lateral Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1][2] |
| Owner and operator | |
| Counties | Johnson, Pope[2] |
| FERC docket | CP26-573[1] |
| Technical information | |
| Length | 13 mi[2] |
| Pipe size | 16"[2] |
| Capacity | capacity of 218 MMcf/d[2] |
| Capacity added | 150 MMcf/d of incremental firm transportation service[2] |
| Cost | $58.95 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Clarksville Lateral Project is a pipeline lateral, operated by Enable Gas Transmission, LLC. It runs 13 miles of 16" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Clarksville Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-573”. Federal Energy Regulatory Commission. 1 September 2026. Retrieved 3 October 2026.
- “Notice of Request Under Blanket Authorization an Establishing Intervention and Protest Deadline re Enable Gas Transmission, LLC's Clarksville Lateral Project under CP26-573.”. Federal Energy Regulatory Commission (staff document). 14 September 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.