Gulf Run Pipeline is a natural gas pipeline in Louisiana, operated by Enable Gas Transmission. It runs 134 miles.[1]

Gulf Run Pipeline
Also calledGulf Run, Gulf Run and Line CP Modification Project[2], Planned Gulf Run and Line CP Modifications Project[2]
General information
Project typeNew build[1]
StatusIn service[1][3]
CommodityNatural gas[1]
Operator
Owner and operator
StateLouisiana[1]
Approved1 June 2021[4][5]
In service14 December 2022[1] or 16 December 2022[3][sources disagree]
FERC docketCP20-70[4]
FERC pre-filing docketPF19-3[2]
Contractors
Technical information
Length134 mi[1]
Capacity1650 MMcf/d additional capacity (EIA)[1]
Cost$540 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Gulf Run Pipeline is a natural gas pipeline in Louisiana, operated by Enable Gas Transmission. It runs 134 miles.[1]

Contractorsedit

ContractorWorkPrime or subScope
Michels Pipeline, Inc.[6]Prime134 miles of 42-inch pipeline, Haynesville supply area to Gulf Coast LNG terminals (firm's figures)
Michels Trenchless, Inc.[6]HDD and boreUnder Michels Pipeline, Inc.Nine HDDs totaling about 4 miles under interstates, bayous, marshes and rivers between Shreveport and Lake Charles, supporting Michels Pipeline
Michels Pipeline, Inc.[6]Primeconstructed the 134 miles of 42-inch pipeline between Shreveport and Lake Charles; about 1,000 people at peak
Michels Trenchless, Inc.[6]HDD and boreUnder Michels Pipeline, Inc.nine horizontal directional drills totaling about 4 miles (interstates, bayous, marshes and rivers)
Michels Construction, Inc.[6]sheet piling for trench support and dewateringUnder Michels Pipeline, Inc.foundation group installed sheet piles for trench support and dewatering

Inspection

FirmScope
Accent Compliance, LLC[7]FERC's preferred third-party compliance monitor for the Gulf Run Pipeline and Line CP Modifications Project, memorandum of understanding executed 2022-01-05

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 14 December 2022[1]
  • 16 December 2022[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Gulf Run Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP20-70”. Federal Energy Regulatory Commission. 28 February 2020. Retrieved 3 October 2026.
  3. “Notice of Commencement of Service, Gulf Run Transmission, LLC et al. (CP20-68, CP20-70)”. Gulf Run Transmission, LLC et al. (filed with FERC). 19 December 2022. Retrieved 4 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “Order Issuing Certificates and Approving Abandonment, Enable Gas Transmission, LLC et al. (CP20-68, CP20-70)”. Federal Energy Regulatory Commission. 1 June 2021. Retrieved 4 October 2026.
  6. “Gulf Run Pipeline - Michels Corporation”. Michels Corporation. Retrieved 3 October 2026.
  7. “Memorandum of Understanding for Third-Party Compliance Monitor, Enable Gulf Run Transmission, LLC (CP20-68, CP20-70)”. Enable Gas Transmission, LLC and Enable Gulf Run Transmission, LLC (filed with FERC). 5 January 2022. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.