Cane Hill Project is a pipeline project in Louisiana, operated by Regency Intrastate Gas LP. It entered service in 2011.
| Cane Hill Project | |
|---|---|
| Also called | Cane Hill Compressor Station and Interconnect Crossover Pipelines[1], Cane Hill Compressor Station and Crossover Line Project[2] |
| General information | |
| Kind | Pipeline project[3] or Facility project[4][sources disagree] |
| Status | In service[5] |
| Owner and operator | |
| State | Louisiana[4] |
| Counties | Caldwell[4] |
| In service | 3 June 2011[5] |
| FERC docket | CP11-21[3] |
| Technical information | |
| Units added | 5 × Caterpillar G3616LE (4,735 hp each)[4] |
| Horsepower added | 23,675 hp[4] |
| On ProvenHand | |
| Hands listed | 0 |
Cane Hill Project is a pipeline project in Louisiana, operated by Regency Intrastate Gas LP. It entered service in 2011.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[4] | Third-party contractor to FERC performing environmental inspections (FERC field inspection report of June 13, 2011) |
| AK Environmental, LLC[4] | Subcontractor to Tetra Tech on the FERC environmental inspection of June 13, 2011 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Cane Hill Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Regency Intrastate Gas quarterly activity report 1 (period ending July 15, 2011), Cane Hill Compressor Station and Interconnect Crossover Pipelines (CP11-21)”. Regency Intrastate Gas LP (filed with FERC). 2 August 2011. Retrieved 4 October 2026.
- “Letter approving an alternative measure (100-foot construction right-of-way for the crossover pipelines), Cane Hill Compressor Station and Crossover Line Project (CP11-21)”. Federal Energy Regulatory Commission (Office of Energy Projects letter). 10 November 2010. Retrieved 4 October 2026.
- “FERC eLibrary docket CP11-21”. Federal Energy Regulatory Commission. 2 November 2010. Retrieved 3 October 2026.
- “FERC field inspection report (June 13, 2011), Cane Hill Compressor Station Project (CP11-21)”. FERC (inspection by Tetra Tech, Inc. under contract to FERC). 13 June 2011. Retrieved 4 October 2026.