Cedar Vale Compressor Station Project is a natural gas pipeline expansion in Oklahoma, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2026.
| Cedar Vale Compressor Station Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | Approved[2] or Under construction[3][sources disagree] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Oklahoma[2][4][5] |
| Counties | Osage[6] |
| Approved | 13 January 2026[4][6] |
| Construction started | May 2026[3] |
| FERC docket | CP25-19[1] |
| Technical information | |
| Capacity | 133 MMcf/d (FERC project list)[2][4][5] |
| Units added | 1 (gas-fired centrifugal compressor unit, 6,091 hp each)[6] |
| Horsepower added | 6,091 hp[6] |
| Cost | $48 million (EIA estimate; no dollar year given)[2] or $48.4 million[6][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Cedar Vale Compressor Station Project is a natural gas pipeline expansion in Oklahoma, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2026.
Inspection
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| Status |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Cedar Vale Compressor Station Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-19”. Federal Energy Regulatory Commission. 18 November 2024. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Monthly Environmental Status Report No. 3 (04/17/2026 to 05/31/2026), Cedar Vale Compression Station Project (CP25-19)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 8 June 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate, Southern Star Central Gas Pipeline, Inc., Cedar Vale Compressor Station Project (CP25-19)”. Federal Energy Regulatory Commission. 13 January 2026. Retrieved 3 October 2026.
- “Field Inspection Report (inspection of 05/27/2026), Cedar Vale Compressor Station Project (CP25-19)”. Federal Energy Regulatory Commission. 9 July 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.