Colorado Hub Connection Project

From the ProvenHand pipeline wiki

Colorado Hub Connection Project is a natural gas pipeline expansion in Colorado, operated by Northwest Pipeline GP. It was built and entered service in 2009. It runs 27.4 miles of 24" pipe.

Colorado Hub Connection Project
Also calledNWPL Colorado Hub Connection Project (CHC)[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
OperatorNorthwest Pipeline GP[1]
Owner and operator
Operator
StateColorado[1][2]
CountiesRio Blanco[3]
Approved2 April 2009[1]
Construction started1 June 2009[4]
In service10 November 2009[2]
FERC docketCP08-477[1]
FERC pre-filing docketPF08-8[1]
Contractors
Technical information
Length27.4 mi[1][2]
Pipe size24"[2]
Capacity582 MMcf/d (FERC project list)[1][2]
Cost$60.4 million (EIA estimate; no dollar year given)[2][3]
On ProvenHand
Hands listed0

Colorado Hub Connection Project is a natural gas pipeline expansion in Colorado, operated by Northwest Pipeline GP. It was built and entered service in 2009. It runs 27.4 miles of 24" pipe.

Contractorsedit

ContractorWorkScope
Snelson Companies, Inc.[5][6]Prime27.5 miles of 24-inch pipe in Rio Blanco County, CO

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Colorado Hub Connection Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Northwest Pipeline GP, Colorado Hub Connection Project (CP08-477)”. Federal Energy Regulatory Commission. 2 April 2009. Retrieved 4 October 2026.
  4. “Weekly Construction Status Report, June 1-7, 2009, Colorado Hub Connection Project (CP08-477)”. Northwest Pipeline GP (filed with FERC). 9 June 2009. Retrieved 4 October 2026.
  5. “Recent Projects (archive 2010-11-14)”. Snelson Companies, Inc. Archived from the original on 14 November 2010. Retrieved 3 October 2026.
  6. “Pipeline Projects - Recent Projects (archive 2011-12-04)”. Snelson Companies, Inc. Archived from the original on 4 December 2011. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.