Snelson Companies, Inc.
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Snelson Companies, Inc. is a pipeline contractor.
| Snelson Companies, Inc. | |
|---|---|
| Also called | |
| General information | |
| Industry | |
| Type | Private[2] |
| Status | Active[4][6] |
| Successors |
|
| Headquarters | Sedro-Woolley[8][10] or The Woodlands[4][sources disagree] |
| Regions | nationwide (licensed throughout the U.S.)[11] |
| Website | www.prim.com[3] |
| PLCA | Member as of 3 October 2026[3] |
| On ProvenHand | |
| Hands listed | 0 |
Snelson Companies, Inc. is a pipeline contractor.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Prime or sub | Scope | Spread | Years | Project built |
|---|---|---|---|---|---|---|
| PG&E Patterson Pipeline Replacement[4][12] | HDD and bore | 7,200-foot horizontal directional drill under the San Joaquin River, replacing 12-inch pipe with 24-inch; San Joaquin River | 1 November 2020 – 1 February 2021 | 2020 | ||
| PG&E Patterson Pipeline Replacement[13] | HDD and bore | 7,200-ft HDD replacement of 1970s 12-inch pipe with 24-inch transmission pipe in Patterson, CA (two drill rigs straddling a river, over 800,000 lb of 24-inch pipe); longest HDD pipeline project in PG&E history; Cal/OSHA Golden Gate Partnership Award | 1 November 2020 – 1 February 2021 | 2020 | ||
| Saginaw Trail Pipeline[4][14] | Prime | Final two phases (3 and 4) of the 24-inch Saginaw Trail replacement | 2017–2020 | |||
| Saginaw Trail Pipeline[2] | Prime | Phase 3: 29.2 miles of new 24-inch pipe replacing 12- and 16-inch between Clio City Gate and Grand Blanc City Gate, rerouted around Flint (awarded April 2019, start anticipated spring 2019) | Phase 3 | 2017–2020 | ||
| Saginaw Trail Pipeline[2] | Prime | Phase 4: 28.2 miles between Grand Blanc City Gate and Clawson Control (to begin 2020; project completion anticipated December 2020) | Phase 4 | 2017–2020 | ||
| Saginaw Trail Pipeline[15] | Prime | Final two phases (3 and 4) of the Saginaw Trail replacement for Consumers Energy | 2017–2020 | |||
| Saginaw Trail Pipeline[4] | Prime | 30 miles of new 24-inch mainline; self-performed grading, stringing, bending, dig/lay, jack and bore, pipe gang, firing line, coating, testing and tie-ins | 2017–2020 | |||
| Mountaineer XPress[16] | Prime | Listed 2018 as a pipeline construction contractor | 2018–2019 | |||
| North Mist Expansion Project[17] | subcontractor (work not stated) | Under Primoris Services Corporation | Listed 2017 as subcontractor to Primoris; work not stated | 2019 | ||
| North Mist Expansion Project[18] | Prime | Listed 2017-2019 as the pipeline installation contractor | 2019 | |||
| Questar Pipeline Project - Main Line 3[19] | Prime | 14 miles of 16-inch take-up and re-lay, Morgan, UT | 2011–2015 | |||
| Spokane Pipeline Replacement Project[20] | Prime | Named as the construction contractor in Northwest's follow-up report to the June 2013 restoration inspection (construction completed August 2012) | 2012 | |||
| Enterprise Products - Falcon to Paradise[19][21] | Prime | 15 miles of 30-inch pipeline between the Paradise and Falcon compressor stations near Pinedale, WY, with four bores and two horizontal directional drills | 1 January 2011 | 2011 | ||
| Enterprise Products - Falcon to Paradise[22] | Prime | 15 miles of 30-inch pipeline between the Paradise and Falcon compressor stations near Pinedale, WY for Enterprise Products Partners, with associated fabrication; four conventional bores totaling over 900 ft; finished ahead of schedule in late October 2011 | 1 July 2011 – 1 October 2011 | 2011 | ||
| ML 104 Extension Project[19][23] | Prime | 25 miles of 24-inch pipeline from the Green River block valve to the Fidlar compressor station near Vernal, UT | 2011 | |||
| ML 104 Extension Project[24] | Prime | 25 miles of 24-inch pipeline from the Green River block valve to the Fidlar compressor station near Vernal, UT for Questar; four bores totaling 370 ft and one HDD of nearly a quarter mile under the Green River; tie-ins and clean-up done by late October | 2011 | |||
| Main Line (ML) 133 Loop Expansion Project[5][19] | Prime | 43 miles of 36-inch pipe near Rock Springs, WY | 2010–2011 | |||
| Gill Ranch Compressor Station[5][25] | Prime | Grass-roots compressor station with five Toromont reciprocating compressors, Fresno, CA | 2010 | |||
| Gill Ranch Storage Lateral[5][19][25] | Prime | 29 miles of 30-inch pipe, 16-, 10- and 3-inch gathering lines and an interconnect site, Fresno, CA | 2010 | |||
| Colorado Hub Connection Project[5][19] | Prime | 27.5 miles of 24-inch pipe in Rio Blanco County, CO | 2009 | |||
| Jackson Prairie Storage Project[26] | Prime | 24-inch gathering line: moved in ROW construction equipment and cleared the right-of-way (named as Snelson in the weekly status report, June 2008) | from 1 June 2008 | 2008 | ||
| Enterprise Products - PCP Loop[19] | Prime | 30 miles of 36-inch pipe, Meeker, CO | ||||
| Kinder Morgan - Fort Bliss Relocation[5][19] | Prime | Relocation of 8-, 12- and 16-inch product pipelines and removal of the existing pipeline, El Paso, TX | ||||
| Nexus Hanoverton Station[4] | Prime | Self-performed piping fabrication and installation, foundations, equipment setting and underground coating for a 52,000 HP greenfield compressor station | ||||
| PG&E Pipeline Replacement Project L-109[27] | Prime | Replacement of a 1936 22-inch pipe with a new 24-inch gas transmission pipeline, within a six-month window | ||||
| Questar Gas Management - Rendezvous VI Expansion/Mesa Line Loop[5][19] | Prime | 110 miles of 30-inch pipe, Sweetwater and Canyon County, WY | ||||
| Williams NW Pipeline - Caldwell 22-inch and 24-inch Replacement[5][19] | Prime | 2 miles of 22-inch and 0.75 miles of 24-inch pipe, Middleton, ID |
Spreads
Spreads this company built as the prime contractor.
| Project | Spread |
|---|---|
| Saginaw Trail Pipeline | Phase 3[2][14] |
| Saginaw Trail Pipeline | Phase 4[2][14] |
Crossings
Crossings this company drilled or bored.
| Project | Feature | Dates |
|---|---|---|
| ML 104 Extension Project | Green River[24] | |
| PG&E Patterson Pipeline Replacement | San Joaquin River[12] | 1 November 2020 – 1 February 2021 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Headquarters city | |
| Headquarters state |
References
- “Services (Snelson site, 2001 capture)”. Snelson Companies, Inc. Archived from the original on 5 May 2001. Retrieved 6 October 2026.
- “PLH Group Announces Significant Pipeline Contract Award (Snelson awarded final two phases of Saginaw Trail Pipeline)”. PLH Group, Inc. (PR Newswire). 11 April 2019. Retrieved 6 October 2026.
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Snelson Companies, Inc. - Primoris”. Primoris Services Corporation (Snelson business unit page). Retrieved 3 October 2026.
- “Recent Projects (archive 2010-11-14)”. Snelson Companies, Inc. Archived from the original on 14 November 2010. Retrieved 3 October 2026.
- “Primoris Services Corporation, Form 10-K FY2022, Exhibit 21.1 (subsidiaries)”. Primoris Services Corporation (filed with the SEC). 28 February 2023. Retrieved 6 October 2026.
- “PLH Group History (PLH Group site, 2014 capture)”. PLH Group, Inc. Archived from the original on 1 December 2014. Retrieved 6 October 2026.
- “Power Line Services Completes Strategic Acquisition of Snelson Companies and IPS Engineering”. Power Line Services / Energy Capital Partners. 30 March 2012. Archived from the original on 3 December 2021. Retrieved 6 October 2026.
- “Our Affiliates (Snelson site, 2010 capture)”. Snelson Companies, Inc. Archived from the original on 14 November 2010. Retrieved 6 October 2026.
- “Integrity Services (Snelson site, 2017 capture; corporate headquarters address)”. Snelson Companies, Inc. Archived from the original on 23 August 2017. Retrieved 6 October 2026.
- “Snelson Companies Inc. Remains Top Choice for Complete Pipeline Construction (Snelson site, 2020)”. Snelson Companies, Inc. 2020. Archived from the original on 1 December 2020. Retrieved 6 October 2026.
- “Snelson Earns Golden Gate Award for Historic HDD Pipeline Project (archive 2021-04-19)”. Snelson Companies, Inc. Archived from the original on 19 April 2021. Retrieved 3 October 2026.
- “Snelson Earns Golden Gate Award for PG&E Pipeline Project”. Trenchless Technology. 3 May 2021. Retrieved 6 October 2026.
- “PLH Group Announces Significant Pipeline Contract Award (archive 2019-07-17)”. Snelson Companies, Inc. Archived from the original on 17 July 2019. Retrieved 3 October 2026.
- “PLH Group announces significant pipeline contract award”. World Pipelines. 12 April 2019. Retrieved 6 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2018)”. Pipeline News. February 2018. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2019)”. Pipeline News. February 2019. Retrieved 3 October 2026.
- “Pipeline Projects - Recent Projects (archive 2011-12-04)”. Snelson Companies, Inc. Archived from the original on 4 December 2011. Retrieved 3 October 2026.
- “Follow-up report to the June 2013 restoration inspection, Spokane Pipeline Replacement Project (CP12-1)”. Northwest Pipeline LLC (filed with FERC). 10 September 2013. Retrieved 4 October 2026.
- “Snelson's Paradise to Falcon Pipeline Project (archive 2015-06-28)”. Snelson Companies, Inc. Archived from the original on 28 June 2015. Retrieved 3 October 2026.
- “Paradise to Falcon (Snelson project page, 2021 capture)”. Snelson Companies, Inc. Archived from the original on 15 May 2021. Retrieved 6 October 2026.
- “A Successful Utah Pipeline Project (archive 2012-09-30)”. Snelson Companies, Inc. Archived from the original on 30 September 2012. Retrieved 3 October 2026.
- “Snelson blog index, 2013 capture (A Successful Utah Pipeline Project; Gill Ranch Compressor Station Project)”. Snelson Companies, Inc. Archived from the original on 22 January 2013. Retrieved 6 October 2026.
- “Gill Ranch Compressor Station Project (archive 2012-09-28)”. Snelson Companies, Inc. Archived from the original on 28 September 2012. Retrieved 3 October 2026.
- “Jackson Prairie Deliverability Expansion Project Weekly Status Report No. 57 (June 27-30, 2008), CP06-412”. Puget Sound Energy, Inc. (filed with FERC). 1 July 2008. Retrieved 4 October 2026.
- “Challenging PG&E Pipeline Replacement Project L-109 Bores Its Way to Success (archive 2019-07-17)”. Snelson Companies, Inc. Archived from the original on 17 July 2019. Retrieved 3 October 2026.