Snelson Companies, Inc.

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Snelson Companies, Inc. is a pipeline contractor.

Snelson Companies, Inc.
Also called
General information
Industry
TypePrivate[2]
StatusActive[4][6]
Successors
HeadquartersSedro-Woolley[8][10] or The Woodlands[4][sources disagree]
Regionsnationwide (licensed throughout the U.S.)[11]
Websitewww.prim.com[3]
PLCAMember as of 3 October 2026[3]
On ProvenHand
Hands listed0

Snelson Companies, Inc. is a pipeline contractor.

This company article is a stub. You can help ProvenHand by expanding it.

Projects

As contractor

ProjectWorkPrime or subScopeSpreadYearsProject built
PG&E Patterson Pipeline Replacement[4][12]HDD and bore7,200-foot horizontal directional drill under the San Joaquin River, replacing 12-inch pipe with 24-inch; San Joaquin River1 November 2020 – 1 February 20212020
PG&E Patterson Pipeline Replacement[13]HDD and bore7,200-ft HDD replacement of 1970s 12-inch pipe with 24-inch transmission pipe in Patterson, CA (two drill rigs straddling a river, over 800,000 lb of 24-inch pipe); longest HDD pipeline project in PG&E history; Cal/OSHA Golden Gate Partnership Award1 November 2020 – 1 February 20212020
Saginaw Trail Pipeline[4][14]PrimeFinal two phases (3 and 4) of the 24-inch Saginaw Trail replacement2017–2020
Saginaw Trail Pipeline[2]PrimePhase 3: 29.2 miles of new 24-inch pipe replacing 12- and 16-inch between Clio City Gate and Grand Blanc City Gate, rerouted around Flint (awarded April 2019, start anticipated spring 2019)Phase 32017–2020
Saginaw Trail Pipeline[2]PrimePhase 4: 28.2 miles between Grand Blanc City Gate and Clawson Control (to begin 2020; project completion anticipated December 2020)Phase 42017–2020
Saginaw Trail Pipeline[15]PrimeFinal two phases (3 and 4) of the Saginaw Trail replacement for Consumers Energy2017–2020
Saginaw Trail Pipeline[4]Prime30 miles of new 24-inch mainline; self-performed grading, stringing, bending, dig/lay, jack and bore, pipe gang, firing line, coating, testing and tie-ins2017–2020
Mountaineer XPress[16]PrimeListed 2018 as a pipeline construction contractor2018–2019
North Mist Expansion Project[17]subcontractor (work not stated)Under Primoris Services CorporationListed 2017 as subcontractor to Primoris; work not stated2019
North Mist Expansion Project[18]PrimeListed 2017-2019 as the pipeline installation contractor2019
Questar Pipeline Project - Main Line 3[19]Prime14 miles of 16-inch take-up and re-lay, Morgan, UT2011–2015
Spokane Pipeline Replacement Project[20]PrimeNamed as the construction contractor in Northwest's follow-up report to the June 2013 restoration inspection (construction completed August 2012)2012
Enterprise Products - Falcon to Paradise[19][21]Prime15 miles of 30-inch pipeline between the Paradise and Falcon compressor stations near Pinedale, WY, with four bores and two horizontal directional drills1 January 20112011
Enterprise Products - Falcon to Paradise[22]Prime15 miles of 30-inch pipeline between the Paradise and Falcon compressor stations near Pinedale, WY for Enterprise Products Partners, with associated fabrication; four conventional bores totaling over 900 ft; finished ahead of schedule in late October 20111 July 2011 – 1 October 20112011
ML 104 Extension Project[19][23]Prime25 miles of 24-inch pipeline from the Green River block valve to the Fidlar compressor station near Vernal, UT2011
ML 104 Extension Project[24]Prime25 miles of 24-inch pipeline from the Green River block valve to the Fidlar compressor station near Vernal, UT for Questar; four bores totaling 370 ft and one HDD of nearly a quarter mile under the Green River; tie-ins and clean-up done by late October2011
Main Line (ML) 133 Loop Expansion Project[5][19]Prime43 miles of 36-inch pipe near Rock Springs, WY2010–2011
Gill Ranch Compressor Station[5][25]PrimeGrass-roots compressor station with five Toromont reciprocating compressors, Fresno, CA2010
Gill Ranch Storage Lateral[5][19][25]Prime29 miles of 30-inch pipe, 16-, 10- and 3-inch gathering lines and an interconnect site, Fresno, CA2010
Colorado Hub Connection Project[5][19]Prime27.5 miles of 24-inch pipe in Rio Blanco County, CO2009
Jackson Prairie Storage Project[26]Prime24-inch gathering line: moved in ROW construction equipment and cleared the right-of-way (named as Snelson in the weekly status report, June 2008)from 1 June 20082008
Enterprise Products - PCP Loop[19]Prime30 miles of 36-inch pipe, Meeker, CO
Kinder Morgan - Fort Bliss Relocation[5][19]PrimeRelocation of 8-, 12- and 16-inch product pipelines and removal of the existing pipeline, El Paso, TX
Nexus Hanoverton Station[4]PrimeSelf-performed piping fabrication and installation, foundations, equipment setting and underground coating for a 52,000 HP greenfield compressor station
PG&E Pipeline Replacement Project L-109[27]PrimeReplacement of a 1936 22-inch pipe with a new 24-inch gas transmission pipeline, within a six-month window
Questar Gas Management - Rendezvous VI Expansion/Mesa Line Loop[5][19]Prime110 miles of 30-inch pipe, Sweetwater and Canyon County, WY
Williams NW Pipeline - Caldwell 22-inch and 24-inch Replacement[5][19]Prime2 miles of 22-inch and 0.75 miles of 24-inch pipe, Middleton, ID

Spreads

Spreads this company built as the prime contractor.

Crossings

Crossings this company drilled or bored.

ProjectFeatureDates
ML 104 Extension ProjectGreen River[24]
PG&E Patterson Pipeline ReplacementSan Joaquin River[12]1 November 2020 – 1 February 2021

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Headquarters city
Headquarters state

References

  1. “Services (Snelson site, 2001 capture)”. Snelson Companies, Inc. Archived from the original on 5 May 2001. Retrieved 6 October 2026.
  2. “PLH Group Announces Significant Pipeline Contract Award (Snelson awarded final two phases of Saginaw Trail Pipeline)”. PLH Group, Inc. (PR Newswire). 11 April 2019. Retrieved 6 October 2026.
  3. “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
  4. “Snelson Companies, Inc. - Primoris”. Primoris Services Corporation (Snelson business unit page). Retrieved 3 October 2026.
  5. “Recent Projects (archive 2010-11-14)”. Snelson Companies, Inc. Archived from the original on 14 November 2010. Retrieved 3 October 2026.
  6. “Primoris Services Corporation, Form 10-K FY2022, Exhibit 21.1 (subsidiaries)”. Primoris Services Corporation (filed with the SEC). 28 February 2023. Retrieved 6 October 2026.
  7. “PLH Group History (PLH Group site, 2014 capture)”. PLH Group, Inc. Archived from the original on 1 December 2014. Retrieved 6 October 2026.
  8. “Power Line Services Completes Strategic Acquisition of Snelson Companies and IPS Engineering”. Power Line Services / Energy Capital Partners. 30 March 2012. Archived from the original on 3 December 2021. Retrieved 6 October 2026.
  9. “Our Affiliates (Snelson site, 2010 capture)”. Snelson Companies, Inc. Archived from the original on 14 November 2010. Retrieved 6 October 2026.
  10. “Integrity Services (Snelson site, 2017 capture; corporate headquarters address)”. Snelson Companies, Inc. Archived from the original on 23 August 2017. Retrieved 6 October 2026.
  11. “Snelson Companies Inc. Remains Top Choice for Complete Pipeline Construction (Snelson site, 2020)”. Snelson Companies, Inc. 2020. Archived from the original on 1 December 2020. Retrieved 6 October 2026.
  12. “Snelson Earns Golden Gate Award for Historic HDD Pipeline Project (archive 2021-04-19)”. Snelson Companies, Inc. Archived from the original on 19 April 2021. Retrieved 3 October 2026.
  13. “Snelson Earns Golden Gate Award for PG&E Pipeline Project”. Trenchless Technology. 3 May 2021. Retrieved 6 October 2026.
  14. “PLH Group Announces Significant Pipeline Contract Award (archive 2019-07-17)”. Snelson Companies, Inc. Archived from the original on 17 July 2019. Retrieved 3 October 2026.
  15. “PLH Group announces significant pipeline contract award”. World Pipelines. 12 April 2019. Retrieved 6 October 2026.
  16. “Ongoing Projects: Construction Underway (Pipeline News, February 2018)”. Pipeline News. February 2018. Retrieved 3 October 2026.
  17. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  18. “Ongoing Projects: Construction Underway (Pipeline News, February 2019)”. Pipeline News. February 2019. Retrieved 3 October 2026.
  19. “Pipeline Projects - Recent Projects (archive 2011-12-04)”. Snelson Companies, Inc. Archived from the original on 4 December 2011. Retrieved 3 October 2026.
  20. “Follow-up report to the June 2013 restoration inspection, Spokane Pipeline Replacement Project (CP12-1)”. Northwest Pipeline LLC (filed with FERC). 10 September 2013. Retrieved 4 October 2026.
  21. “Snelson's Paradise to Falcon Pipeline Project (archive 2015-06-28)”. Snelson Companies, Inc. Archived from the original on 28 June 2015. Retrieved 3 October 2026.
  22. “Paradise to Falcon (Snelson project page, 2021 capture)”. Snelson Companies, Inc. Archived from the original on 15 May 2021. Retrieved 6 October 2026.
  23. “A Successful Utah Pipeline Project (archive 2012-09-30)”. Snelson Companies, Inc. Archived from the original on 30 September 2012. Retrieved 3 October 2026.
  24. “Snelson blog index, 2013 capture (A Successful Utah Pipeline Project; Gill Ranch Compressor Station Project)”. Snelson Companies, Inc. Archived from the original on 22 January 2013. Retrieved 6 October 2026.
  25. “Gill Ranch Compressor Station Project (archive 2012-09-28)”. Snelson Companies, Inc. Archived from the original on 28 September 2012. Retrieved 3 October 2026.
  26. “Jackson Prairie Deliverability Expansion Project Weekly Status Report No. 57 (June 27-30, 2008), CP06-412”. Puget Sound Energy, Inc. (filed with FERC). 1 July 2008. Retrieved 4 October 2026.
  27. “Challenging PG&E Pipeline Replacement Project L-109 Bores Its Way to Success (archive 2019-07-17)”. Snelson Companies, Inc. Archived from the original on 17 July 2019. Retrieved 3 October 2026.