ML 104 Extension Project
From the ProvenHand pipeline wiki
ML 104 Extension Project is a natural gas pipeline in Utah, operated by Questar Pipeline. It entered service in 2011. It runs 24.6 miles of 24" pipe.
| ML 104 Extension Project | |
|---|---|
| Also called | ML 104 to Fidlar Extension Project[1], ML 104 Extension to Fidlar Project[2] |
| General information | |
| Kind | Pipeline project[3] |
| Commodity | Natural gas[4] |
| Owner and operator | |
| State | Utah[3] |
| Counties | Uintah[4] |
| Approved | 4 May 2011[3][4] |
| In service | 11 November 2011[2] |
| FERC docket | CP11-25[3] |
| FERC pre-filing docket | PF10-7[3] |
| Contractors | |
| Technical information | |
| Length | 24.6 mi[3][4] |
| Pipe size | 24"[4] |
| Capacity | 160 MMcf/d (FERC project list)[3] |
| On ProvenHand | |
| Hands listed | 0 |
ML 104 Extension Project is a natural gas pipeline in Utah, operated by Questar Pipeline. It entered service in 2011. It runs 24.6 miles of 24" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Snelson Companies, Inc.[5][6] | Prime | 25 miles of 24-inch pipeline from the Green River block valve to the Fidlar compressor station near Vernal, UT |
| Snelson Companies, Inc.[7] | Prime | 25 miles of 24-inch pipeline from the Green River block valve to the Fidlar compressor station near Vernal, UT for Questar; four bores totaling 370 ft and one HDD of nearly a quarter mile under the Green River; tie-ins and clean-up done by late October |
Crossings
| Feature | Method | Contractor |
|---|---|---|
| Green River[7] | HDD | Snelson Companies, Inc. |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on ML 104 Extension Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP11-25”. Federal Energy Regulatory Commission. 10 November 2010. Retrieved 3 October 2026.
- “Notice of Completion of Construction and Commencement of Service, ML 104 Extension to Fidlar Project (CP11-25)”. Questar Pipeline Company (filed with FERC). 17 November 2011. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate, ML 104 Extension to Fidlar Project (CP11-25)”. Federal Energy Regulatory Commission. 4 May 2011. Retrieved 4 October 2026.
- “Pipeline Projects - Recent Projects (archive 2011-12-04)”. Snelson Companies, Inc. Archived from the original on 4 December 2011. Retrieved 3 October 2026.
- “A Successful Utah Pipeline Project (archive 2012-09-30)”. Snelson Companies, Inc. Archived from the original on 30 September 2012. Retrieved 3 October 2026.
- “Snelson blog index, 2013 capture (A Successful Utah Pipeline Project; Gill Ranch Compressor Station Project)”. Snelson Companies, Inc. Archived from the original on 22 January 2013. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.