Saginaw Trail Pipeline

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Saginaw Trail Pipeline is a natural gas pipeline in Michigan, operated by Consumers Energy Inc. It entered service in 2020.

Saginaw Trail Pipeline
General information
KindPipeline project[1]
Project typeNew build[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateMichigan[1]
CountiesGenesee, Oakland, Saginaw[2]
Construction started2017[3] or June 2017[2][sources disagree]
In service23 November 2020[1]
LaborUnion[2]
Contractors
Technical information
Length94 mi[1] or 94.4 mi[4][sources disagree]
Pipe size24"[1]
Capacity200 MMcf/d additional capacity (EIA)[1]
Cost$610 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Saginaw Trail Pipeline is a natural gas pipeline in Michigan, operated by Consumers Energy Inc. It entered service in 2020.

Contractorsedit

ContractorWorkPrime or subScopeSpreadYears
Snelson Companies, Inc.[4][5]PrimeFinal two phases (3 and 4) of the 24-inch Saginaw Trail replacement
R-Value Foam Insulation LLC[6]Scope not itemized (foam padding and restoration firm)Through Welded Construction, Mt. Morris, MI: 18 miles
Lunda Construction Company[7]Temporary sheet pile and shoringTemporary sheet pile for the 24-inch pipe, third of four phases (29.2 miles, Clio to Grand Blanc, MI)until 1 January 2019
Welded Construction, L.P.[2][3][8]PrimePipeline contractor for phases 1 and 2 (37 miles of the 24-inch replacement)
Southeast Directional Drilling[3]HDD and boreHDD portion of the first two phases (six Phase 2 bores, 1,800 to 4,300 ft)
Phillips & Jordan Inc.[9]Clearing and reclamationUnder Welded Construction, L.P.Clearing of 18 miles of 24-inch right-of-way in Genesee and Saginaw counties, MI (HQ Mount Morris), for Welded Construction (listed 2017)
Holland Engineering[10]Engineering, survey, HDD design and environmental permittingEngineering, surveying, construction staking and weld as-built, HDD crossing design, wetland and species surveys and environmental permitting for Consumers Energy
Snelson Companies, Inc.[11]PrimePhase 3: 29.2 miles of new 24-inch pipe replacing 12- and 16-inch between Clio City Gate and Grand Blanc City Gate, rerouted around Flint (awarded April 2019, start anticipated spring 2019)Phase 3
Snelson Companies, Inc.[11]PrimePhase 4: 28.2 miles between Grand Blanc City Gate and Clawson Control (to begin 2020; project completion anticipated December 2020)Phase 4
Snelson Companies, Inc.[12]PrimeFinal two phases (3 and 4) of the Saginaw Trail replacement for Consumers Energy
Snelson Companies, Inc.[5]Prime30 miles of new 24-inch mainline; self-performed grading, stringing, bending, dig/lay, jack and bore, pipe gang, firing line, coating, testing and tie-ins

Pipe mills

MillDiameter
Stupp[13]24 in

Spreads

SpreadPrime contractorDates
Phase 1[3]Welded Construction, L.P.until 1 January 2017
Phase 2[3]Welded Construction, L.P.until 1 January 2018
Phase 3[4][11]Snelson Companies, Inc.
Phase 4[4][11]Snelson Companies, Inc.

Crossings

FeatureMethodContractor
CNRR[10]HDD
Flint River[10]HDD
I-69[10]HDD
Mid-Michigan Railroad[10]HDD
Shiawassee River[3][10]HDDSoutheast Directional Drilling
Swan Creek I[10]HDD
Swan Creek II[10]HDD
Tittabawassee River[3][10]HDDSoutheast Directional Drilling

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Construction started
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Saginaw Trail Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Saginaw Trail Pipeline Modernizing Michigan's Natural Gas Infrastructure to Improve Safety, Reliability”. CMS Energy Corporation (Consumers Energy news release, PR Newswire). 21 August 2017. Retrieved 3 October 2026.
  3. “Consumers Energy Modernizes System with Saginaw Trail Pipeline”. Underground Construction magazine. May 2019. Retrieved 3 October 2026.
  4. “PLH Group Announces Significant Pipeline Contract Award (archive 2019-07-17)”. Snelson Companies, Inc. Archived from the original on 17 July 2019. Retrieved 3 October 2026.
  5. “Snelson Companies, Inc. - Primoris”. Primoris Services Corporation (Snelson business unit page). Retrieved 3 October 2026.
  6. “PROJECTS - R-Value Foam”. R-Value Foam Insulation LLC. Retrieved 3 October 2026.
  7. “Saginaw Trail Pipeline”. Lunda Construction Company. Retrieved 3 October 2026.
  8. “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
  9. “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
  10. “Saginaw Trail Pipeline (Energy Division project page)”. Holland Engineering. Retrieved 4 October 2026.
  11. “PLH Group Announces Significant Pipeline Contract Award (Snelson awarded final two phases of Saginaw Trail Pipeline)”. PLH Group, Inc. (PR Newswire). 11 April 2019. Retrieved 6 October 2026.
  12. “PLH Group announces significant pipeline contract award”. World Pipelines. 12 April 2019. Retrieved 6 October 2026.
  13. “Saginaw Trail Pipeline Project, Michigan”. Offshore Technology. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.