PG&E Patterson Pipeline Replacement

From the ProvenHand pipeline wiki

PG&E Patterson Pipeline Replacement is a pipeline replacement in California, operated by PG&E. Construction began in 2020.

PG&E Patterson Pipeline Replacement
General information
KindPipeline project[1]
Project typeReplacement[1]
OperatorPG&E[1]
Owner
StateCalifornia[1]
Construction startedNovember 2020[2]
Contractors
Technical information
Pipe size24"[1]
On ProvenHand
Hands listed0

PG&E Patterson Pipeline Replacement is a pipeline replacement in California, operated by PG&E. Construction began in 2020.

Contractorsedit

ContractorWorkScopeYears
Snelson Companies, Inc.[1][3]HDD and bore7,200-foot horizontal directional drill under the San Joaquin River, replacing 12-inch pipe with 24-inch; San Joaquin River1 November 2020 – 1 February 2021
Snelson Companies, Inc.[2]HDD and bore7,200-ft HDD replacement of 1970s 12-inch pipe with 24-inch transmission pipe in Patterson, CA (two drill rigs straddling a river, over 800,000 lb of 24-inch pipe); longest HDD pipeline project in PG&E history; Cal/OSHA Golden Gate Partnership Award1 November 2020 – 1 February 2021

Crossings

FeatureMethodContractorDates
San Joaquin River[1]HDDSnelson Companies, Inc.1 November 2020 – 1 February 2021

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on PG&E Patterson Pipeline Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Snelson Earns Golden Gate Award for Historic HDD Pipeline Project (archive 2021-04-19)”. Snelson Companies, Inc. Archived from the original on 19 April 2021. Retrieved 3 October 2026.
  2. “Snelson Earns Golden Gate Award for PG&E Pipeline Project”. Trenchless Technology. 3 May 2021. Retrieved 6 October 2026.
  3. “Snelson Companies, Inc. - Primoris”. Primoris Services Corporation (Snelson business unit page). Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.