Columbia to Eastover Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Columbia to Eastover Project is a natural gas pipeline in South Carolina, operated by Dominion Carolina Gas Transmission, LLC. Construction began in 2016.
| Columbia to Eastover Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | South Carolina[1][2] |
| Counties | Calhoun, Richland[3] |
| Approved | 2 June 2016[1] |
| Construction started | August 2016[4] |
| In service | November 2016[2] or 10 November 2016[5][sources disagree] |
| FERC docket | CP15-504[1] |
| Contractors | |
| Technical information | |
| Length | 28 mi[1] or 29 mi[2][sources disagree] |
| Pipe size | 8"[2] |
| Capacity | 18 MMcf/d (FERC project list)[1][2] |
| Cost | $36 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Columbia to Eastover Project is a natural gas pipeline in South Carolina, operated by Dominion Carolina Gas Transmission, LLC. Construction began in 2016.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Latex Construction[6][7] | Prime | 28 miles of 8-inch pipeline in Richland and Calhoun Counties, SC (client Dominion Carolina Gas; listed as recently completed, 2019-2022) |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Columbia to Eastover Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Weekly Status Report for June 8-17, 2016, Columbia to Eastover Project (CP15-504)”. Dominion Carolina Gas Transmission, LLC (filed with FERC). 24 June 2016. Retrieved 4 October 2026.
- “Weekly Status Report (August 2016), Columbia to Eastover Project (CP15-504)”. Dominion Carolina Gas Transmission, LLC (filed with FERC). 26 August 2016. Retrieved 4 October 2026.
- “Notification of In-Service, Columbia to Eastover Project (CP15-504)”. Dominion Carolina Gas Transmission, LLC (filed with FERC). 17 November 2016. Retrieved 4 October 2026.
- “Recently Completed Projects | latexconstruction (August 2020 capture)”. Latex Construction Company. Archived from the original on 12 August 2020. Retrieved 6 October 2026.
- “Recently Completed Projects | latexconstruction (December 2022 capture)”. Latex Construction Company. Archived from the original on 4 December 2022. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.