Comanche Trail Pipeline

From the ProvenHand pipeline wiki

Comanche Trail Pipeline is a natural gas pipeline in Texas, operated by Energy Transfer. It entered service in 2017. It runs 195 miles of 42" pipe.[1]

Comanche Trail Pipeline
Also calledComanche Trail
General information
CommodityNatural gas
OperatorEnergy Transfer
Facility project
StateTexas
In service2017
Contractors
Technical information
Length195 mi
Pipe size42"[3]
On ProvenHand
Hands listed0

Comanche Trail Pipeline is a natural gas pipeline in Texas, operated by Energy Transfer. It entered service in 2017. It runs 195 miles of 42" pipe.[1]

Contractorsedit

ContractorWorkScopeYears
Pumpco, Inc.[4][5]PrimeListed as Comanche Trails Pipeline, LLC: 194.3 miles of 42-inch, 0.600-inch wall (Coyanosa, TX to El Paso, TX); page gives a projected completion of December 2016from 1 April 2016
Pumpco, Inc.[6]PrimeIIR listing: Comanche Trail awarded Pumpco (G/C) 195 miles of 42-inch, Waha Hub through Pecos, Reeves (59 mi), Culberson (51 mi) and Hudspeth (65 mi) Counties to San Elizario, TX; completion Jan 2017until 1 January 2017

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Comanche Trail Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. eia.gov · EIA-NaturalGasPipelineProjects.xlsx
  2. “Environmental Assessment, San Elizario Crossing Project (CP15-503)”. Federal Energy Regulatory Commission. January 2016. Retrieved 4 October 2026.
  3. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  4. “WAHA 42" 340 Miles - Pumpco”. Pumpco, Inc. Archived from the original on 10 August 2020. Retrieved 3 October 2026.
  5. “Ongoing Projects: Construction Underway (Pipeline News, March 2017)”. Pipeline News. March 2017. Retrieved 3 October 2026.
  6. “Industrial Info Resources project report on the Whistler grassroot natural gas pipeline (Exhibit GPLDC-1b, South Dakota PUC docket HP22-001)”. Industrial Info Resources (as filed with the South Dakota Public Utilities Commission). 2023. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.