San Elizario Crossing Project is a natural gas pipeline in Texas, operated by Comanche Trail Pipeline, LLC.

San Elizario Crossing Project
Also calledComanche Trail Pipeline[1]
General information
KindPipeline project[1]
Project typeNew build[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
Part ofComanche Trail Pipeline[3]
StateTexas[1][2]
Approved19 May 2016[1]
In service30 January 2017[2] or 29 April 2017[4][sources disagree]
FERC docketCP15-503[1]
Technical information
Length0.2 mi[1] or 195 mi[2][sources disagree]
Pipe size42"[2]
Capacity1100 MMcf/d (FERC project list)[1][2]
Cost$2.5 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

San Elizario Crossing Project is a natural gas pipeline in Texas, operated by Comanche Trail Pipeline, LLC.

Crossings

FeatureMethod
Rio Grande[5]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 30 January 2017[2]
  • 29 April 2017[4]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on San Elizario Crossing Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Environmental Assessment, San Elizario Crossing Project (CP15-503)”. Federal Energy Regulatory Commission. January 2016. Retrieved 4 October 2026.
  4. “Notice of Commencement of Service and Affirmative Statement, San Elizario Crossing Project (CP15-503)”. Comanche Trail Pipeline, LLC (filed with FERC). 30 June 2017. Retrieved 4 October 2026.
  5. “San Elizario Crossing Project Weekly Status Report No. 006 (CP15-503)”. Comanche Trail Pipeline, LLC (filed with FERC). 26 August 2016. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.