Barnard Pipeline, Inc.
From the ProvenHand pipeline wiki
Barnard Pipeline, Inc. is a pipeline contractor based in Bozeman, Montana.
| Barnard Pipeline, Inc. | |
|---|---|
| General information | |
| Industry | |
| Status | Active[2] |
| Headquarters | Bozeman, Montana[2] |
| Website | www.barnard-inc.com/services/oil-gas[1] |
| PLCA | Member as of 3 October 2026[1] |
| On ProvenHand | |
| Hands listed | 0 |
Barnard Pipeline, Inc. is a pipeline contractor based in Bozeman, Montana.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Project built |
|---|---|---|---|
| Keystone XL Pipeline[4] | Prime | One of six U.S. union contractors awarded 2021 pipeline construction contracts (announced Oct 2020); project suspended Jan 2021 | 2020 |
| North Fork Nooksack Line Lowering Project[3] | Prime | Lowered about 1,700 ft of 30-inch pipeline at the North Fork Nooksack River crossing near Deming, WA using 122 dewatering wells, and removed, slurry-filled and nitrogen-inerted a retired 26-inch line | 2019 |
| Apex Expansion Project[2] | Prime | Built 28 miles of high-pressure natural gas pipeline through the Wasatch Range, Utah (the site's 2011 milestone, called the Wasatch Loop Pipeline), with grades of 40 percent or steeper and helicopter delivery of crews and materials | 2011 |
References
- “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
- “Our Story (milestones)”. Barnard Construction Company, Inc. Retrieved 3 October 2026.
- “North Fork Nooksack Line Lowering (project page)”. Barnard Construction Company, Inc. Retrieved 3 October 2026.
- “TC Energy Awards More Than $1.6 billion in American Contracts to Build Keystone XL”. TC Energy Corporation. 28 October 2020. Retrieved 3 October 2026.