Guardian Pipeline, L.L.C.
From the ProvenHand pipeline wiki
Guardian Pipeline, L.L.C. is a pipeline owner-operator based in Detroit, Michigan.
| Guardian Pipeline, L.L.C. | |
|---|---|
| Legal name | GUARDIAN PIPELINE, LLC[1] |
| General information | |
| Industry | |
| Headquarters | Detroit, Michigan[1] |
| PHMSA operator ID | 31712[3] |
| On ProvenHand | |
| Hands listed | 0 |
Guardian Pipeline, L.L.C. is a pipeline owner-operator based in Detroit, Michigan.
This company article is a stub. You can help ProvenHand by expanding it.
Pipeline systems and facilities
1 system and facility this company owned or operated, current ones first.
| System or facility | Kind | State | Role |
|---|---|---|---|
| Guardian Pipeline[1] | Pipeline system | IL, WI | Operator |
Projects
As owner or operator
| Project | Role | Status | Project built |
|---|---|---|---|
| G-II: Expansion and Extension[2] | Owner and operator | In service | 2008–2009 |
| Guardian Pipeline Guardian Pipeline Project[2] | Owner and operator | In service | 2002 |
| BC Organics Interconnect Project[5] | Owner and operator | Approved | |
| Bluff Creek Modernization Project[6] | Owner and operator | Approved | |
| Graymont Western Lime LDC Bypass Project[7] | Owner and operator | Approved | |
| Guardian 3 Expansion Project[3][8] | Owner and operator | Proposed | |
| Guardian Eden Compressor Station[9] | Owner and operator | Proposed | |
| Guardian Joliet Compressor Station (G3 Expansion Project)[9] | Owner and operator | Proposed |
References
- “PHMSA annual report data: annual gas transmission gathering 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP26-548”. Federal Energy Regulatory Commission. 1 July 2026. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP21-482”. Federal Energy Regulatory Commission. 4 August 2021. Retrieved 3 October 2026.
- “FERC eLibrary docket CP26-535”. Federal Energy Regulatory Commission. 29 May 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket CP20-136”. Federal Energy Regulatory Commission. 8 April 2020. Retrieved 3 October 2026.
- “Abbreviated Application for a Certificate of Public Convenience and Necessity, Guardian 3 Expansion Project (CP26-548): Volume I, Resource Report 2 with Appendix 2D HDD design report, and Resource Report 9”. Guardian Pipeline, L.L.C. (filed with FERC). 1 July 2026. Retrieved 3 October 2026.
- “Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Guardian 3 Expansion Project (CP26-548)”. Federal Energy Regulatory Commission. 29 July 2026. Retrieved 3 October 2026.