G-II: Expansion and Extension is a natural gas pipeline expansion in Illinois and Wisconsin, operated by Guardian Pipeline, L.L.C.. Construction began in 2008 and the line entered service in 2009.

G-II: Expansion and Extension
Also calledGuardian Pipeline Expansion and Extension Project[1]
General information
KindPipeline project[1]
Project typeExpansion[2][3]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
Facility projects
StatesIllinois, Wisconsin[1][2]
CountiesIllinois: DeKalb
Wisconsin: Brown, Calumet, Dodge, Fond du Lac, Jefferson, Outagamie
[4]
Approved14 December 2007[1]
Construction startedApril 2008[5]
In service25 February 2009[2]
FERC docketCP07-8[1]
FERC pre-filing docketPF06-21[1]
Technical information
Length119.2 mi[1] or 119 mi[2][sources disagree]
Pipe size20 in, 42 in[2] or 12 in, 16 in, 20 in, 30 in[5][sources disagree]
Capacity537.2 MMcf/d (FERC project list)[1][2]
Cost$350 million (EIA estimate; no dollar year given)[2] or $260 million, excluding AFUDC[6][sources disagree]
On ProvenHand
Hands listed0

G-II: Expansion and Extension is a natural gas pipeline expansion in Illinois and Wisconsin, operated by Guardian Pipeline, L.L.C.. Construction began in 2008 and the line entered service in 2009.

Inspection

FirmScopeYears
Key Agricultural Services, Inc.[7]Post-construction agricultural restoration monitoring (field inspections of restored tracts)1 September 2011

Spreads

Spread
Single spread[5][8]

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $350 million (EIA estimate; no dollar year given)[2]
  • $260 million, excluding AFUDC[6]
Diameters
  • 20 in, 42 in[2]
  • 12 in, 16 in, 20 in, 30 in[5]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on G-II: Expansion and Extension? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP07-8”. Federal Energy Regulatory Commission. 13 October 2006. Retrieved 3 October 2026.
  4. “Order Issuing Certificate, Guardian Pipeline, L.L.C. (CP07-8)”. Federal Energy Regulatory Commission. 14 December 2007. Retrieved 4 October 2026.
  5. “Weekly Construction Progress Report, April 19-25, 2008, G-II Expansion Project (CP07-8)”. Guardian Pipeline, L.L.C. (filed with FERC). 29 April 2008. Retrieved 4 October 2026.
  6. “ONEOK Partners Accepts FERC Certificate for Guardian Pipeline Expansion and Extension Project”. ONEOK Partners, L.P. 3 January 2008. Retrieved 4 October 2026.
  7. “2011 Post-Construction Restoration report, G-II Project (CP07-8)”. Guardian Pipeline, L.L.C. (filed with FERC). 14 November 2011. Retrieved 4 October 2026.
  8. “Initial Implementation Plan, G-II Project (CP07-8)”. Guardian Pipeline, L.L.C. (filed with FERC). 14 February 2008. Retrieved 4 October 2026.