Michels Directional Crossings
From the ProvenHand pipeline wiki
Michels Directional Crossings is a pipeline contractor.
| Michels Directional Crossings | |
|---|---|
| General information | |
| Industry | |
| On ProvenHand | |
| Hands listed | 0 |
Michels Directional Crossings is a pipeline contractor.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Project built |
|---|---|---|---|
| Gulf Coast Pipeline (Cushing to Nederland)[1] | HDD and bore | 19 directional drills along the Payne County, OK to Angelina County, TX route | 2012–2014 |
| Alberta Clipper (Line 67), US portion[2] | HDD and bore | HDD crossings for the 36-inch Alberta Clipper from Neche, ND toward Superior: 47,600 ft of 36-inch pipe in crossings of 1,300 to 5,200 ft (33 crossings together with Southern Lights) | 2009–2010 |
| Southern Lights Diluents Pipeline[2] | HDD and bore | HDD crossings for the 20-inch Southern Lights line in Minnesota: 30,837 ft of 20-inch pipe in crossings of 1,000 to 5,200 ft, starting at crossing No. 11 near Leonard, MN (33 crossings together with Alberta Clipper) |
References
- “Michels Awarded Work on Keystone XL Project”. Trenchless Technology. 21 October 2010. Retrieved 6 October 2026.
- “20 Large-Diameter Crossings”. Trenchless Technology. 1 February 2010. Retrieved 6 October 2026.