Concord to Sacramento

From the ProvenHand pipeline wiki

Concord to Sacramento is a refined products pipeline replacement in California, operated by Kinder Morgan. It entered service in 2004. It runs 70 miles of 20" pipe.

Concord to Sacramento
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusIn service[2]
CommodityRefined products[1][2]
OperatorKinder Morgan[1]
Owner
StateCalifornia[2]
CountiesContra Costa, Solano, Yolo[3]
In serviceDecember 2004[2]
Contractors
Technical information
Length70 mi[2]
Pipe size20"[1][2]
Capacityincreases the capacity on the pipeline from 119,000 barrels per day to 167,000 barrels per day[2]
Cost$95 million[2]
On ProvenHand
Hands listed0

Concord to Sacramento is a refined products pipeline replacement in California, operated by Kinder Morgan. It entered service in 2004. It runs 70 miles of 20" pipe.

Contractorsedit

ContractorWorkScope
ARB, Inc.[1]PrimeLaid out and installed 70 miles of 20-inch pipeline including 14 drill crossings totaling 19,800 ft for refined petroleum product

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Concord to Sacramento? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “ARB Underground projects: Concord - Sacramento (Wayback capture 2006-05-27)”. ARB, Inc. Archived from the original on 27 May 2006. Retrieved 3 October 2026.
  2. “Kinder Morgan Energy Partners, L.P. annual report on Form 10-K for 2004”. Kinder Morgan Energy Partners, L.P. (filed with the SEC). 4 March 2005. Retrieved 3 October 2026.
  3. “Concord to Sacramento Petroleum Products Pipeline, Draft EIR (SCH 2002022010), CEQAnet record”. California State Lands Commission (lead agency), via CEQAnet. 12 June 2003. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.