ARB, Inc.

From the ProvenHand pipeline wiki

ARB, Inc. is a pipeline contractor based in Lake Forest, California.

ARB, Inc.
General information
Industry
HeadquartersLake Forest, California[4]
Websitewww.primoriscorp.com/business-units/arb-industrial[1]
PLCAMember as of 3 October 2026[1]
On ProvenHand
Hands listed0

ARB, Inc. is a pipeline contractor based in Lake Forest, California.

This company article is a stub. You can help ProvenHand by expanding it.

Projects

As contractor

ProjectWorkScopeSpreadYearsProject built
Line 57C Lateral[5]PrimeMcDonald Island Line 57C replacement project, Holt, CA (ARB Underground group; contract amount $25.1 million; listed as recently completed in Feb 2008)2007
Enbridge East Texas Pipeline[6]Prime107 miles of 36-inch natural gas pipeline from Bethel to Carthage, TX, one spread, with two horizontal directional drills2005
Beluga Transmission Pipeline Relocation Project[7]HDD and boreHorizontal directional drill under the Susitna River installing 4,350 ft of 20-inch pipe, winter work reached over a 26-mile ice road1 February 2004 – 1 March 20042004
Concord to Sacramento[8]PrimeLaid out and installed 70 miles of 20-inch pipeline including 14 drill crossings totaling 19,800 ft for refined petroleum product2004
Kern River Gas Transmission Pre PF[2]PrimeSpread 10: 82 miles of 42-inch pipe from Daggett to Mojave, CA, finished in four months (the other spreads were 36-inch)Spread 102003
Chevron I-5 Carmenita Interchange Improvement[9]interchange project, scope not statedSanta Fe Springs, CA project that Chevron Pipe Line Company named an outstanding project for 2012
Chevron VTA Relocation, Phase 2[9]relocation project, scope not statedMilpitas, CA project that Chevron Pipe Line Company named an outstanding project for 2012
Kinder Morgan Pipeline Relocation / Replacement[10]PrimeOntario, CA relocation ahead of a grade separation: about 15,650 ft of new 16-, 24- and 6-inch pipe, two cased bores and three HDDs, 3,500 ft of open trench
Pastoria Pipeline[3]Prime14.05 miles of 20-inch natural gas pipeline plus a meter/regulator station at the Pastoria Energy Facility and a pig launcher and tie-in at the Mojave Kern River connection

Spreads

Spreads this company built as the prime contractor.

Crossings

Crossings this company drilled or bored.

ProjectFeatureDates
Beluga Transmission Pipeline Relocation ProjectSusitna River[7][11]1 February 2004 – 1 March 2004
Enbridge East Texas PipelineCatfish Creek[6]
Enbridge East Texas PipelineNeches River[6]

References

  1. “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
  2. “ARB Underground projects: Kern River Pipeline (Wayback capture 2006-05-27)”. ARB, Inc. Archived from the original on 27 May 2006. Retrieved 3 October 2026.
  3. “ARB Underground projects: Pastoria Pipeline (Wayback capture 2005-01-02)”. ARB, Inc. Archived from the original on 2 January 2005. Retrieved 3 October 2026.
  4. “About Us (Wayback capture 2013-11-09)”. ARB, Inc. Archived from the original on 9 November 2013. Retrieved 3 October 2026.
  5. “Rhapsody Acquisition Corp. Form 8-K (merger with Primoris Corporation): notable recently completed projects by the Underground group”. Rhapsody Acquisition Corp. (SEC filing). 20 February 2008. Retrieved 4 October 2026.
  6. “ARB Underground projects: Enbridge (Wayback capture 2006-05-27)”. ARB, Inc. Archived from the original on 27 May 2006. Retrieved 3 October 2026.
  7. “ARB Underground projects: Anchorage Alaska (Wayback capture 2006-05-27)”. ARB, Inc. Archived from the original on 27 May 2006. Retrieved 3 October 2026.
  8. “ARB Underground projects: Concord - Sacramento (Wayback capture 2006-05-27)”. ARB, Inc. Archived from the original on 27 May 2006. Retrieved 3 October 2026.
  9. “ARB Underground Receives two Outstanding Project Awards (media, 8 April 2013) (Wayback capture 2014-10-13)”. ARB, Inc. 8 April 2013. Archived from the original on 13 October 2014. Retrieved 3 October 2026.
  10. “Kinder Morgan Pipeline Replacement (media, 3 December 2013) (Wayback capture 2014-10-03)”. ARB, Inc. 3 December 2013. Archived from the original on 3 October 2014. Retrieved 3 October 2026.
  11. “This month in history: Longest horizontal directional drilled pipe (reprint of a June 6, 2004 Petroleum News story)”. Petroleum News. 16 June 2024. Retrieved 3 October 2026.