Kern River Gas Transmission Pre PF
From the ProvenHand pipeline wiki
Kern River Gas Transmission Pre PF is a natural gas pipeline expansion in California, Nevada, Utah and Wyoming, operated by Kern River Gas Transmission Company. It entered service in 2003.
| Kern River Gas Transmission Pre PF | |
|---|---|
| Also called | KR Mainline 2003 System Expansion[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| States | California, Nevada, Utah, Wyoming[1][2] |
| Approved | 17 July 2002[2] |
| In service | May 2003[1] |
| FERC docket | CP01-422[2] |
| Contractors | |
| Technical information | |
| Length | 716.7 mi[2] or 716 mi[1][sources disagree] |
| Pipe size | 36"[1] |
| Capacity | 885.6 MMcf/d (FERC project list)[2] or 900 MMcf/d additional capacity (EIA)[1][sources disagree] |
| Cost | $1260 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Kern River Gas Transmission Pre PF is a natural gas pipeline expansion in California, Nevada, Utah and Wyoming, operated by Kern River Gas Transmission Company. It entered service in 2003.
Contractorsedit
| Contractor | Work | Scope | Spread | Years |
|---|---|---|---|---|
| Associated Pipe Line Contractors, Inc.[3] | Prime | Spread 7: 36-inch heavy-wall pipeline, Washington County, UT and Clark and Lincoln Counties, NV, mechanized welding | Spread 7 | 1 December 2002 – 1 March 2003 |
| Associated Pipe Line Contractors, Inc.[3] | Prime | Spread 8: 54.4 miles of 36-inch heavy-wall pipeline, Clark County, NV and San Bernardino County, CA | Spread 8 | 1 December 2002 – 1 March 2003 |
| Associated Pipe Line Contractors, Inc.[4] | Prime | Spread 3: 59.8 miles of 36-inch heavy-wall pipeline (1750 psig MAOP), mechanized welding | Spread 3 | until 1 March 2003 |
| Associated Pipe Line Contractors, Inc.[4] | Prime | Spread 6 (location given as St. George, UT): 36-inch heavy-wall pipeline | Spread 6 | until 1 March 2003 |
| ARB, Inc.[5] | Prime | Spread 10: 82 miles of 42-inch pipe from Daggett to Mojave, CA, finished in four months (the other spreads were 36-inch) | Spread 10 |
Spreads
| Spread | Prime contractor |
|---|---|
| Spread 10[5] | ARB, Inc. |
| Spread 3[4] | Associated Pipe Line Contractors, Inc. |
| Spread 6[4] | Associated Pipe Line Contractors, Inc. |
| Spread 7[3] | Associated Pipe Line Contractors, Inc. |
| Spread 8[3] | Associated Pipe Line Contractors, Inc. |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Kern River Gas Transmission Pre PF? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Major pipeline projects executed by Associated Pipe Line Contractors, Inc. (Wayback capture 2004-10-13)”. Associated Pipe Line Contractors, Inc. Archived from the original on 13 October 2004. Retrieved 3 October 2026.
- “Major pipeline projects executed by Associated Pipe Line Contractors, Inc. (Wayback capture 2009-05-02)”. Associated Pipe Line Contractors, Inc. Archived from the original on 2 May 2009. Retrieved 3 October 2026.
- “ARB Underground projects: Kern River Pipeline (Wayback capture 2006-05-27)”. ARB, Inc. Archived from the original on 27 May 2006. Retrieved 3 October 2026.