Kern River Gas Transmission Pre PF is a natural gas pipeline expansion in California, Nevada, Utah and Wyoming, operated by Kern River Gas Transmission Company. It entered service in 2003.

Kern River Gas Transmission Pre PF
Also calledKR Mainline 2003 System Expansion[1]
General information
KindPipeline project[2]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Owner and operator
StatesCalifornia, Nevada, Utah, Wyoming[1][2]
Approved17 July 2002[2]
In serviceMay 2003[1]
FERC docketCP01-422[2]
Contractors
Technical information
Length716.7 mi[2] or 716 mi[1][sources disagree]
Pipe size36"[1]
Capacity885.6 MMcf/d (FERC project list)[2] or 900 MMcf/d additional capacity (EIA)[1][sources disagree]
Cost$1260 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Kern River Gas Transmission Pre PF is a natural gas pipeline expansion in California, Nevada, Utah and Wyoming, operated by Kern River Gas Transmission Company. It entered service in 2003.

Contractorsedit

ContractorWorkScopeSpreadYears
Associated Pipe Line Contractors, Inc.[3]PrimeSpread 7: 36-inch heavy-wall pipeline, Washington County, UT and Clark and Lincoln Counties, NV, mechanized weldingSpread 71 December 2002 – 1 March 2003
Associated Pipe Line Contractors, Inc.[3]PrimeSpread 8: 54.4 miles of 36-inch heavy-wall pipeline, Clark County, NV and San Bernardino County, CASpread 81 December 2002 – 1 March 2003
Associated Pipe Line Contractors, Inc.[4]PrimeSpread 3: 59.8 miles of 36-inch heavy-wall pipeline (1750 psig MAOP), mechanized weldingSpread 3until 1 March 2003
Associated Pipe Line Contractors, Inc.[4]PrimeSpread 6 (location given as St. George, UT): 36-inch heavy-wall pipelineSpread 6until 1 March 2003
ARB, Inc.[5]PrimeSpread 10: 82 miles of 42-inch pipe from Daggett to Mojave, CA, finished in four months (the other spreads were 36-inch)Spread 10

Spreads

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 885.6 MMcf/d (FERC project list)[2]
  • 900 MMcf/d additional capacity (EIA)[1]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Kern River Gas Transmission Pre PF? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “Major pipeline projects executed by Associated Pipe Line Contractors, Inc. (Wayback capture 2004-10-13)”. Associated Pipe Line Contractors, Inc. Archived from the original on 13 October 2004. Retrieved 3 October 2026.
  4. “Major pipeline projects executed by Associated Pipe Line Contractors, Inc. (Wayback capture 2009-05-02)”. Associated Pipe Line Contractors, Inc. Archived from the original on 2 May 2009. Retrieved 3 October 2026.
  5. “ARB Underground projects: Kern River Pipeline (Wayback capture 2006-05-27)”. ARB, Inc. Archived from the original on 27 May 2006. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.