Delek Logistics - CVBSR 12" & Guidon 12" & 8"
From the ProvenHand pipeline wiki
Delek Logistics - CVBSR 12" & Guidon 12" & 8" is a pipeline project in Texas, operated by Delek Logistics.
| Delek Logistics - CVBSR 12" & Guidon 12" & 8" | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Operator | Delek Logistics[1] |
| Operator | |
| State | Texas[1] |
| Contractors | |
| Technical information | |
| Pipe size | 8", 12"[1] |
| On ProvenHand | |
| Hands listed | 0 |
Delek Logistics - CVBSR 12" & Guidon 12" & 8" is a pipeline project in Texas, operated by Delek Logistics.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| M.G. Dyess, LLC[1] | Prime | 62 miles of 12-inch and 10.91 miles of 8-inch at Odessa, TX (listed as a current project, October 2019) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Delek Logistics - CVBSR 12" & Guidon 12" & 8"? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Current Projects - MG Dyess (October 2019 capture)”. M.G. Dyess, Inc. Archived from the original on 16 October 2019. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.