M.G. Dyess, LLC is a pipeline contractor based in Bassfield, Mississippi. It is part of Quanta Services, Inc..

M.G. Dyess, LLC
Also called
General information
Industry
TypePrivate[5]
StatusActive[6]
Parent companyQuanta Services, Inc.[6]
Successor
HeadquartersBassfield, Mississippi, US[1][6][7]
RegionsAZ,CO,NM,UT,WY, OK,TX, Mexico, IL,IA,KS,MO,NE, IN,MI,OH, AL,AR,LA,MS,TN, FL,GA,SC,PR,VI, KY,NC,VA,WV, DE,MD,NJ,PA[2]
Websitewww.mgdyess.com[2] or https://mgdyess.com[1][sources disagree]
PLCANot a PLCA member as of 3 October 2026[8]
On ProvenHand
Hands listed0

M.G. Dyess, LLC is a pipeline contractor based in Bassfield, Mississippi. It is part of Quanta Services, Inc..

This company article is a stub. You can help ProvenHand by expanding it.

Projects

As contractor

ProjectWorkPrime or subScopeSpreadYearsProject built
Midcontinent Supply Header Interstate Pipeline Project[9][10]construction contractor given notice to proceed (scope not stated)2020
Midcontinent Supply Header Interstate Pipeline Project[11]PrimePipeline construction (listed as contractor in Pipeline News, July 2018)2020
Access South/Adair Southwest/Lebanon Extension[12][13]PrimeListed 2018 as Spectra - Access South - Adair Southwest: 9.15 miles and 4.63 miles of 36-inch, OH2017–2018
NEXUS Gas Transmission[14]subcontractor (work not stated)Under FluorListed 2017 as a subcontractor to Fluor; work not stated2017–2018
NEXUS Gas Transmission[15]PrimePipeline construction in Ohio (listed 2018-2019)2017–2018
Southwest Louisiana Supply Project[3][13]PrimeDelhi, LA, listed 2017: launchers and receivers, meter station construction and maintenance, and pipeline for the Southwest Louisiana Supply Project2017–2018
Kingsport Expansion[16][17]PrimeListed as Spectra Energy - Kingsport Expansion Project: 6.5 miles and 3.3 miles of 16-inch and 5.7 miles of 24-inch in Sullivan County, TN and Washington and Smith Counties, VA; steep slopes, two hard-rock HDDs; estimated in-service date November 26, 20142015
Kingsport Expansion[18]PrimeNamed as the contractor on the Fordtown Clean Burn conversion and Eastman Mainline Extension; setting up pipe yards and offloading pipe in May 2014from 1 May 20142015
Cadiz to DEO[19]PrimeListed 2018 as Energy Transfer - Cadiz to DEO: 3.11 miles of 24-inch with two launcher/receivers, OH
Compressor Station 306 Reversal[20]PrimeMalvern, AR, listed 2019: four pig traps modified for bi-directional inline inspection, four gas coolers, three coalescing filter separators, new MCC building, condensate tank, control and fire-and-gas upgrades
Constellation Pipeline Extension Project[21]PrimeListed 2017-2018 as contractor: 21 miles of 8-, 20- and 24-inch in Butler County, PA
Cottonwood Bar Levee Relocation[22]PrimeListed 2014 (Kinder Morgan, Southern Natural Gas): Mississippi River levee pipeline modifications, about 700 feet of 24-inch on the west bank (LA) and about 500 feet of 20- and 22-inch on the east bank (MS), old pipe removed
Delek Logistics - CVBSR 12" & Guidon 12" & 8"[23]Prime62 miles of 12-inch and 10.91 miles of 8-inch at Odessa, TX (listed as a current project, October 2019)
Line 427 Phase II[23]PrimePipeline and station work: 20 miles of 16-inch, 13 meter/regulator stations and 7 HDDs, 98% complete (listed as a current project, October 2019)
Majorsville to Beech Bottom[23]Prime14 miles of 20-inch in rough terrain, Spreads 1 & 2 (listed as a current project, October 2019, almost complete)Spread 1
Majorsville to Beech Bottom[23]Prime14 miles of 20-inch in rough terrain, Spreads 1 & 2 (listed as a current project, October 2019, almost complete)Spread 2
Majorsville to Hopedale[24]PrimeListed 2013 as Markwest - Majorsville to Hopedale - Spreads 3 & 4 (6-12-inch, 10-25 miles)Spread 3
Majorsville to Hopedale[24]PrimeListed 2013 as Markwest - Majorsville to Hopedale - Spreads 3 & 4 (6-12-inch, 10-25 miles)Spread 4
MarkWest Utica EMG - Seneca to Cadiz Phase 2 South[16][25]PrimeSeneca to Cadiz Phase 2 South ethane pipeline, Noble and Monroe Counties, OH (project page dated 2014): 15.2 miles of 10-inch, 7 bored road crossings, 2 bored stream crossings, 27 open-cut stream crossings
Mid-Continent Supply Header Interstate Pipeline Project[4]PrimeSpread 3 of the Midship Pipeline Project for Cheniere Midship Pipeline, LLC: about 80.5 miles of 36-inch mainline with mainline valves, Ardmore to Bennington OK (page dated 2019)Spread 3
Mid-Continent Supply Header Interstate Pipeline Project[26]Primenamed with Strike and Cenergy as contracted for construction of the pipeline and associated facilities
Noble Midstream - Billie Minor System[27]PrimeListed 2018: six laterals of various diameters in steel and HDPE, TX
Noble Midstream - Coronado Gathering System[28]PrimeListed 2018: six laterals of various diameters in steel and HDPE, TX
Revolution Gathering Phase II[29]Prime1.2 miles of 8-inch, 4.8 miles of 20-inch and 18.5 miles of 24-inch in Butler County, PA (listed as a current project 2015-2016; estimated in-service November 2015)
Revolution Gathering Phase II[29]HDD and boreTwo 24-inch HDDs totaling 1,800 feet, performed in-house
Revolution Gathering Phase II[30]PrimeRight-of-way, lower-in and welding crews on the Revolution Gathering Phase II project for ETC in Butler County, PA (news posts October to December 2015)
Salt Creek Midstream - Apache NGL Meter Station[23]Prime20-, 16- and 12-inch meter station in Reeves County, TX, 70% complete (listed as a current project, October 2019)
Salt Creek Midstream - Brandywine[31]PrimeListed 2019: 27.2 miles of 20-inch, TX
Slope Creek to Tri-County Pipeline & Laterals[24]PrimeListed 2013 as Markwest - Slope Creek to Tri-County Pipeline & Laterals (18-24-inch, 1-10 miles)
Southern Company Kemper County IGCC Natural Gas Pipeline[32]PrimeListed 2012: 6 miles of 16-inch pipeline and meter station facilities near Meridian, MS
Targa Resources - Old Tom Loop[33]PrimeListed 2018: 25,000 feet of 12-inch poly pipe, TX
Velma Lateral[34]PrimePipeline construction (listed January 2023 as a planned project awaiting approvals; contractor M.G. Dyess Inc.)
Wacker Project[35]PrimeListed 2014: 2,600 feet of 8-inch pipe and a meter station, TN

Spreads

Spreads this company built as the prime contractor.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Website
  • www.mgdyess.com[2]
  • https://mgdyess.com[1]

References

  1. “Quality - MG Dyess (home page)”. M.G. Dyess, LLC. Retrieved 6 October 2026.
  2. “APCA member directory entry: M.G. Dyess, LLC”. American Pipeline Contractors Association. Retrieved 3 October 2026.
  3. “Southwest Louisiana Supply - MG Dyess”. M.G. Dyess, LLC. Retrieved 3 October 2026.
  4. “Midship Pipeline - Spread 3 - MG Dyess”. M.G. Dyess, LLC. Retrieved 3 October 2026.
  5. “Quanta Services, Inc. Form 10-K for 2022, Exhibit 21.1 subsidiaries”. Quanta Services, Inc. (filed with the SEC). 23 February 2023. Retrieved 6 October 2026.
  6. “About Us - MG Dyess”. M.G. Dyess, LLC. Retrieved 3 October 2026.
  7. “M.G. Dyess Inc. - Company Overview (2004 capture)”. M.G. Dyess Inc. Archived from the original on 24 June 2004. Retrieved 6 October 2026.
  8. “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
  9. “$680 million pipeline gets green light to move natural gas from Oklahoma to Gulf Coast”. Houston Chronicle. 4 March 2019. Retrieved 4 October 2026.
  10. “Cheniere, EIG Complete Financing, Issue Full Notice to Proceed on $650M Midship Pipeline Project”. Construction Equipment Guide (Business Wire). 13 March 2019. Retrieved 4 October 2026.
  11. “Pipeline News, July 2018: planned projects list (Midship Project, CP17-458)”. Pipeline News. July 2018. Retrieved 4 October 2026.
  12. “Spectra – Access South – Adair Southwest | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 9 April 2019. Retrieved 3 October 2026.
  13. “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
  14. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  15. “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
  16. “CURRENT PROJECTS | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 12 October 2013. Retrieved 3 October 2026.
  17. “Spectra Energy – Kingsport Expansion | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 20 August 2016. Retrieved 3 October 2026.
  18. “Biweekly Status Report, Kingsport Expansion Project (CP13-534), May 2014”. East Tennessee Natural Gas, LLC (filed with FERC). 13 May 2014. Retrieved 6 October 2026.
  19. “Energy Transfer – Cadiz to DEO | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 9 April 2019. Retrieved 3 October 2026.
  20. “Compressor Station 306 Reversal - MG Dyess”. M.G. Dyess, LLC. Retrieved 3 October 2026.
  21. “Ongoing Projects: Construction Underway (Pipeline News, February 2018)”. Pipeline News. February 2018. Retrieved 3 October 2026.
  22. “Kinder Morgan Cottonwood Bar Levee Relocation | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 20 August 2016. Retrieved 3 October 2026.
  23. “Current Projects - MG Dyess (October 2019 capture)”. M.G. Dyess, Inc. Archived from the original on 16 October 2019. Retrieved 6 October 2026.
  24. “Projects - MG Dyess (2014 capture of the project database, page 1)”. M.G. Dyess, Inc. Archived from the original on 15 October 2014. Retrieved 6 October 2026.
  25. “MarkWest Utica EMG, LLC – Seneca to Cadiz Phase 2 South | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 20 August 2016. Retrieved 3 October 2026.
  26. “Midship Natural Gas Pipeline, Oklahoma, USA”. Offshore Technology. Retrieved 4 October 2026.
  27. “Noble Midstream – Billie Minor System | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 9 April 2019. Retrieved 3 October 2026.
  28. “Noble Midstream – Coronado Gathering System | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 9 April 2019. Retrieved 3 October 2026.
  29. “Current Projects - MG Dyess (2016 capture)”. M.G. Dyess, Inc. Archived from the original on 22 October 2016. Retrieved 6 October 2026.
  30. “News & Updates - MG Dyess (2016 capture)”. M.G. Dyess, Inc. Archived from the original on 16 November 2016. Retrieved 6 October 2026.
  31. “Salt Creek Midstream – Brandywine | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 9 April 2019. Retrieved 3 October 2026.
  32. “Southern Company Kemper County IGCC Natural Gas Pipeline | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 17 October 2014. Retrieved 3 October 2026.
  33. “Targa Resources – Old Tom Loop | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 9 April 2019. Retrieved 3 October 2026.
  34. “Planned Projects, Pipeline News January 2023”. Pipeline & Gas Journal / Pipeline News. January 2023. Retrieved 6 October 2026.
  35. “Spectra Energy – Wacker Project | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 20 August 2016. Retrieved 3 October 2026.