Majorsville to Beech Bottom
From the ProvenHand pipeline wiki
Majorsville to Beech Bottom is a pipeline project, operated by Markwest. It runs 14 miles of 20" pipe.
| Majorsville to Beech Bottom | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Operator | |
| Contractors | |
| Technical information | |
| Length | 14 mi[1] |
| Pipe size | 20"[1] |
| On ProvenHand | |
| Hands listed | 0 |
Majorsville to Beech Bottom is a pipeline project, operated by Markwest. It runs 14 miles of 20" pipe.
Contractorsedit
| Contractor | Work | Scope | Spread |
|---|---|---|---|
| M.G. Dyess, LLC[1] | Prime | 14 miles of 20-inch in rough terrain, Spreads 1 & 2 (listed as a current project, October 2019, almost complete) | Spread 1 |
| M.G. Dyess, LLC[1] | Prime | 14 miles of 20-inch in rough terrain, Spreads 1 & 2 (listed as a current project, October 2019, almost complete) | Spread 2 |
Spreads
| Spread | Prime contractor |
|---|---|
| Spread 1[1] | M.G. Dyess, LLC |
| Spread 2[1] | M.G. Dyess, LLC |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Majorsville to Beech Bottom? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Current Projects - MG Dyess (October 2019 capture)”. M.G. Dyess, Inc. Archived from the original on 16 October 2019. Retrieved 6 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.