Majorsville to Beech Bottom

From the ProvenHand pipeline wiki

Majorsville to Beech Bottom is a pipeline project, operated by Markwest. It runs 14 miles of 20" pipe.

Majorsville to Beech Bottom
General information
KindPipeline project[1]
Operator
Contractors
Technical information
Length14 mi[1]
Pipe size20"[1]
On ProvenHand
Hands listed0

Majorsville to Beech Bottom is a pipeline project, operated by Markwest. It runs 14 miles of 20" pipe.

Contractorsedit

ContractorWorkScopeSpread
M.G. Dyess, LLC[1]Prime14 miles of 20-inch in rough terrain, Spreads 1 & 2 (listed as a current project, October 2019, almost complete)Spread 1
M.G. Dyess, LLC[1]Prime14 miles of 20-inch in rough terrain, Spreads 1 & 2 (listed as a current project, October 2019, almost complete)Spread 2

Spreads

SpreadPrime contractor
Spread 1[1]M.G. Dyess, LLC
Spread 2[1]M.G. Dyess, LLC

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Majorsville to Beech Bottom? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Current Projects - MG Dyess (October 2019 capture)”. M.G. Dyess, Inc. Archived from the original on 16 October 2019. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.