Access South/Adair Southwest/Lebanon Extension
From the ProvenHand pipeline wiki
Access South/Adair Southwest/Lebanon Extension is a natural gas pipeline loop, operated by Texas Eastern Transmission, LP. Construction began in 2017 and the line entered service in 2018.
| Access South/Adair Southwest/Lebanon Extension | |
|---|---|
| Also called | 36- inch diameter pipeline at the Access South Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Loop[3] |
| Status | In service[4] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| Facility projects | |
| States | KY, MS, OH[2] or AL, KY, MS, OH, PA[6][sources disagree] |
| Counties | Kentucky: Monroe Mississippi: Attala Ohio: Athens, Meigs, Monroe, Noble[3] |
| Approved | 21 December 2016[2][3] |
| Construction started | January 2017[6] |
| In service | 1 May 2018[4] |
| FERC docket | CP16-3[2] |
| FERC pre-filing docket | PF15-17[2] |
| Contractors | |
| Technical information | |
| Length | 15.8 mi[2] or 16.3 mi[3][sources disagree] |
| Pipe size | 16", 36"[3] |
| Capacity | 622 MMcf/d (FERC project list)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Access South/Adair Southwest/Lebanon Extension is a natural gas pipeline loop, operated by Texas Eastern Transmission, LP. Construction began in 2017 and the line entered service in 2018.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| M.G. Dyess, LLC[5][7] | Prime | Listed 2018 as Spectra - Access South - Adair Southwest: 9.15 miles and 4.63 miles of 36-inch, OH |
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[8] | FERC's third-party contractor on the Commission's construction/environmental inspections |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Access South/Adair Southwest/Lebanon Extension? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP16-3”. Federal Energy Regulatory Commission. 8 October 2015. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Order issuing certificate(s), docket CP16-3: Order Issuing Certification and Approving Abandonment re Texas Eastern Transmission, LP un”. Federal Energy Regulatory Commission. 21 December 2016. Retrieved 4 October 2026.
- “Final Notice of Commencement of Service, Access South and Adair Southwest Projects (CP16-3)”. Texas Eastern Transmission, LP (filed with FERC). 3 May 2018. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, September 2017)”. Pipeline News. September 2017. Retrieved 3 October 2026.
- “Biweekly Status Report No. 1 (Jan 19 - Feb 3, 2017), Access South, Adair Southwest, and Lebanon Extension Projects (CP16-3)”. Texas Eastern Transmission, LP (filed with FERC). 16 February 2017. Retrieved 4 October 2026.
- “Spectra – Access South – Adair Southwest | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 9 April 2019. Retrieved 3 October 2026.
- “Environmental Inspection Report, Access South, Adair Southwest, and Lebanon Extension Projects, conducted May 3-4, 2017 (CP16-3)”. Federal Energy Regulatory Commission. 26 May 2017. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.