MarkWest Utica EMG - Seneca to Cadiz Phase 2 South
From the ProvenHand pipeline wiki
MarkWest Utica EMG - Seneca to Cadiz Phase 2 South is an NGL pipeline in Ohio. It runs 15.2 miles of 10" pipe.
| MarkWest Utica EMG - Seneca to Cadiz Phase 2 South | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Commodity | NGL[1] |
| Owner | |
| State | Ohio[1] |
| Contractors | |
| Technical information | |
| Length | 15.2 mi[1] |
| Pipe size | 10"[1] |
| On ProvenHand | |
| Hands listed | 0 |
MarkWest Utica EMG - Seneca to Cadiz Phase 2 South is an NGL pipeline in Ohio. It runs 15.2 miles of 10" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| M.G. Dyess, LLC[1][2] | Prime | Seneca to Cadiz Phase 2 South ethane pipeline, Noble and Monroe Counties, OH (project page dated 2014): 15.2 miles of 10-inch, 7 bored road crossings, 2 bored stream crossings, 27 open-cut stream crossings |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on MarkWest Utica EMG - Seneca to Cadiz Phase 2 South? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “CURRENT PROJECTS | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 12 October 2013. Retrieved 3 October 2026.
- “MarkWest Utica EMG, LLC – Seneca to Cadiz Phase 2 South | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 20 August 2016. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.