Kingsport Expansion
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Kingsport Expansion is a natural gas pipeline expansion, operated by East Tennessee Nat Gas Co. It runs 15.6 miles of 16" pipe.
| Kingsport Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1][2] |
| Commodity | Natural gas[1] |
| Operator | East Tennessee Nat Gas Co[1] |
| Operator | |
| Owner and operator | |
| State | TN[1] or TN, VA[4][sources disagree] |
| Counties | Tennessee: Sullivan Virginia: Smyth, Washington[4] |
| Approved | 12 March 2014[4] |
| In service | January 2015[1] or 1 January 2015[2][sources disagree] |
| FERC docket | CP13-534[1] |
| FERC pre-filing docket | PF13-6[3] |
| Contractors | |
| Technical information | |
| Length | 15.6 mi[1] |
| Pipe size | 16 in[1] or 16 in, 24 in[4][sources disagree] |
| Capacity | 61 MMcf/d additional capacity (EIA)[1] |
| Cost | $113.5 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Kingsport Expansion is a natural gas pipeline expansion, operated by East Tennessee Nat Gas Co. It runs 15.6 miles of 16" pipe.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| M.G. Dyess, LLC[5] | Prime | Named as the contractor on the Fordtown Clean Burn conversion and Eastman Mainline Extension; setting up pipe yards and offloading pipe in May 2014 | from 1 May 2014 |
| M.G. Dyess, LLC[6][7] | Prime | Listed as Spectra Energy - Kingsport Expansion Project: 6.5 miles and 3.3 miles of 16-inch and 5.7 miles of 24-inch in Sullivan County, TN and Washington and Smith Counties, VA; steep slopes, two hard-rock HDDs; estimated in-service date November 26, 2014 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Diameters | |
| In service | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Kingsport Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Kingsport Expansion Project (CP13-534)”. East Tennessee Natural Gas, LLC (filed with FERC). 9 January 2015. Retrieved 4 October 2026.
- “FERC eLibrary docket CP13-534”. Federal Energy Regulatory Commission. 14 August 2013. Retrieved 3 October 2026.
- “Order Issuing Certificate and Granting Abandonment, East Tennessee Natural Gas, LLC, Kingsport Expansion Project (CP13-534)”. Federal Energy Regulatory Commission. 12 March 2014. Retrieved 4 October 2026.
- “Biweekly Status Report, Kingsport Expansion Project (CP13-534), May 2014”. East Tennessee Natural Gas, LLC (filed with FERC). 13 May 2014. Retrieved 6 October 2026.
- “CURRENT PROJECTS | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 12 October 2013. Retrieved 3 October 2026.
- “Spectra Energy – Kingsport Expansion | MG Dyess”. M.G. Dyess, LLC. Archived from the original on 20 August 2016. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.