East Tennessee Natural Gas, LLC is a pipeline owner-operator based in Houston, Texas.

East Tennessee Natural Gas, LLC
Legal nameEAST TENNESSEE NATURAL GAS, LLC[1] or EAST TENNESSEE NATURAL GAS, LLC (SPECTRA ENERGY PARTNERS, LP)[1][sources disagree]
Also called
  • East Tennessee Natural Gas, LLC (spectra Energy Partners, Lp) (1 January 2015 – 1 January 2022)[1]
  • East Tennessee Nat Gas Co[2]
General information
Industry
HeadquartersHouston, Texas[1]
PHMSA operator ID4070[3]
Earlier PHMSA operator ID4070[1]
On ProvenHand
Hands listed0

East Tennessee Natural Gas, LLC is a pipeline owner-operator based in Houston, Texas.

This company article is a stub. You can help ProvenHand by expanding it.

Names

NameKindYears
East Tennessee Natural Gas, LLC (spectra Energy Partners, Lp)[1]Other name1 January 2015 – 1 January 2022
East Tennessee Nat Gas Co[2]Other name

Pipeline systems and facilities

2 systems and facilities this company owned or operated, current ones first.

System or facilityKindStateRole
East Tennessee Natural Gas[5]Pipeline systemGA, NC, TN, VAOperator
East Tennessee Natural Gas Kingsport LNG[6]LNG peak-shaving or storageTNOperator

Projects

As owner or operator

ProjectRoleStatusProject built
Draper Compressor Station[7]Owner and operatorIn service2024–2025
Hartsville Compressor Station[8]Owner and operatorUnder construction2025
Ridgeline Expansion Project[3][8]Owner and operatorUnder construction2025
Ridgeline Expansion Project[2]OperatorUnder construction2025
System Alignment Program[3]Owner and operatorUnder construction2024–2025
Talbott Compressor Station[7]Owner and operatorIn service2024–2025
Ridgetop to Dixon Springs Replacement Project[9]Owner and operatorIn service2023
L-722 Replacement Project[4]Owner and operatorIn service2022
Topside Meter Station[10]Owner2022
Loudon Expansion Project[2]OperatorIn service2016
Loudon Expansion Project[11]Owner and operatorIn service2016
Kingsport Expansion[2]OperatorIn service2015
Kingsport Expansion[12]Owner and operatorIn service2015
Northeastern Tennessee Proj (NET Proj[3]Owner and operatorIn service2011
Northeastern Tennessee Proj (NET Proj[2]OperatorIn service2011
ETenn CNX Pressure Increase[2]OperatorIn service2008
ETenn CNX Pressure Increase[13]Owner and operatorIn service2008
ETenn Patriot Extension III[2]OperatorIn service2008
Jewell Ridge Pipeline[3]Owner and operatorIn service2006
Murray Lateral[3]Owner and operatorIn service2002
East Tenn Upgrades[2]OperatorIn service1996
East Tennessee Natural Gas TVA Project[3]Owner and operator
Greenway/Nora Expansion Project[14]Owner and operator
Jewel Ridge[15]Owner
Patriot Project[3]Owner and operator
Wacker Project[16]Operator
Wacker Project[17]Owner and operator

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Legal name
  • EAST TENNESSEE NATURAL GAS, LLC[1]
  • EAST TENNESSEE NATURAL GAS, LLC (SPECTRA ENERGY PARTNERS, LP)[1]

References

  1. “PHMSA annual report data: annual liquefied natural gas 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “FERC eLibrary docket CP22-32”. Federal Energy Regulatory Commission. 17 December 2021. Retrieved 3 October 2026.
  5. “PHMSA annual report data: annual gas transmission gathering 2010 present”. Pipeline and Hazardous Materials Safety Administration. Archived from the original on 8 May 2026. Retrieved 3 October 2026.
  6. “FERC: U.S. LNG peak-shavers (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
  7. “Order Issuing Certificate and Approving Abandonment, System Alignment Program (CP23-131)”. FERC. 21 March 2024. Retrieved 3 October 2026.
  8. “Order Issuing Certificate, East Tennessee Natural Gas, LLC (191 FERC 61,004), Ridgeline Expansion Project”. FERC. 2 April 2025. Retrieved 3 October 2026.
  9. “FERC eLibrary docket CP23-480”. Federal Energy Regulatory Commission. 12 May 2023. Retrieved 3 October 2026.
  10. “Prior Notice of Blanket Certificate Activity, Topside Junction Meter and Regulator Station (CP22-32)”. East Tennessee Natural Gas, LLC (filed with FERC). 17 December 2021. Retrieved 4 October 2026.
  11. “FERC eLibrary docket CP15-91”. Federal Energy Regulatory Commission. 20 February 2015. Retrieved 3 October 2026.
  12. “FERC eLibrary docket CP13-534”. Federal Energy Regulatory Commission. 14 August 2013. Retrieved 3 October 2026.
  13. “FERC eLibrary docket CP08-35”. Federal Energy Regulatory Commission. 13 December 2007. Retrieved 3 October 2026.
  14. “FERC eLibrary docket CP08-355”. Federal Energy Regulatory Commission. 1 May 2008. Retrieved 3 October 2026.
  15. “Price Gregory : Lower 48 Project Info”. Price Gregory International, LLC. 22 September 2010. Archived from the original on 22 September 2010. Retrieved 3 October 2026.
  16. “East Tennessee Natural Gas, LLC variance request, pipeline lateral re-route for the Wacker Project (CP12-484)”. East Tennessee Natural Gas, LLC (filed with FERC). 20 November 2013. Retrieved 4 October 2026.
  17. “FERC eLibrary docket CP12-484”. Federal Energy Regulatory Commission. 20 July 2012. Retrieved 3 October 2026.