Murray Lateral

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Murray Lateral is a natural gas pipeline expansion in Georgia and Tennessee, operated by East Tennessee Natural Gas, LLC. It entered service in 2002. It runs 27 miles of 20" pipe.

Murray Lateral
Also calledETenn Murray Project[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StatesGeorgia, Tennessee[1][2]
Approved11 October 2001[1]
In serviceSeptember 2002[2]
FERC docketCP01-80[1]
Technical information
Length27 mi[1][2]
Pipe size20"[2]
Capacity170 MMcf/d (FERC project list)[1] or 160 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$69.39 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Murray Lateral is a natural gas pipeline expansion in Georgia and Tennessee, operated by East Tennessee Natural Gas, LLC. It entered service in 2002. It runs 27 miles of 20" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 170 MMcf/d (FERC project list)[1]
  • 160 MMcf/d additional capacity (EIA)[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Murray Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.