Murray Lateral
From the ProvenHand pipeline wiki
Murray Lateral is a natural gas pipeline expansion in Georgia and Tennessee, operated by East Tennessee Natural Gas, LLC. It entered service in 2002. It runs 27 miles of 20" pipe.
| Murray Lateral | |
|---|---|
| Also called | ETenn Murray Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Georgia, Tennessee[1][2] |
| Approved | 11 October 2001[1] |
| In service | September 2002[2] |
| FERC docket | CP01-80[1] |
| Technical information | |
| Length | 27 mi[1][2] |
| Pipe size | 20"[2] |
| Capacity | 170 MMcf/d (FERC project list)[1] or 160 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Cost | $69.39 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Murray Lateral is a natural gas pipeline expansion in Georgia and Tennessee, operated by East Tennessee Natural Gas, LLC. It entered service in 2002. It runs 27 miles of 20" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Murray Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.