System Alignment Program

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

System Alignment Program is a natural gas pipeline replacement in North Carolina, Tennessee and Virginia, operated by East Tennessee Natural Gas, LLC. Construction began in 2024 and the line entered service in 2025. It runs 22.5 miles of 24" pipe.

System Alignment Program
Also calledSystem Alignment Project[1]
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusUnder construction[2] or In service[3][sources disagree]
CommodityNatural gas[2]
Owner and operator
Facility projects
StatesNorth Carolina, Tennessee, Virginia[2][4]
CountiesNorth Carolina: Rockingham
Tennessee: Jefferson, Knox, Sevier

Virginia: Patrick, Washington, Wythe
[5]
Approved21 March 2024[4][5]
Construction started3 September 2024[6]
In service1 August 2025[3]
FERC docketCP23-131[1]
FERC pre-filing docketPF22-8[1]
Contractors
Technical information
Length22.5 mi[2][4]
Pipe size24"[2]
Cost$390 million (EIA estimate; no dollar year given)[2] or Program total $390,099,970 (Exhibit K, current dollars)[7][sources disagree]
On ProvenHand
Hands listed0

System Alignment Program is a natural gas pipeline replacement in North Carolina, Tennessee and Virginia, operated by East Tennessee Natural Gas, LLC. Construction began in 2024 and the line entered service in 2025. It runs 22.5 miles of 24" pipe.

Contractorsedit

ContractorWorkScope
PipeSak Pipeline Protection[8]Rockshield (pipe protection) supplierRockStop rockshield for the new 24-inch pipeline

Spreads

Spread
Spread 1[7][9]
Spread 2[7][9]
Spread 3[7][9]
Spread 4[9]
Spread 5[9]
Spread 6[9]

Crossings

FeatureMethod
Chapman Highway (Boyds Creek Loop, Knox County, TN)[7]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $390 million (EIA estimate; no dollar year given)[2]
  • Program total $390,099,970 (Exhibit K, current dollars)[7]
Status
  • Under construction[2]
  • In service[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on System Alignment Program? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP23-131”. Federal Energy Regulatory Commission. 31 March 2023. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of Commencement of Service on the remaining program facilities, System Alignment Program (CP23-131)”. East Tennessee Natural Gas, LLC (filed with FERC). 11 August 2025. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “Order Issuing Certificate and Approving Abandonment, System Alignment Program (CP23-131)”. FERC. 21 March 2024. Retrieved 3 October 2026.
  6. “Notice of Commencement of Construction, System Alignment Program (CP23-131)”. East Tennessee Natural Gas, LLC (filed with FERC). 10 September 2024. Retrieved 3 October 2026.
  7. “Abbreviated Application for a Certificate, System Alignment Program, Volume I-A (CP23-131)”. East Tennessee Natural Gas, LLC (filed with FERC). 31 March 2023. Retrieved 3 October 2026.
  8. “Natural Gas System Alignment (project page)”. PipeSak Inc. Retrieved 3 October 2026.
  9. “Implementation Plan, System Alignment Program (CP23-131)”. East Tennessee Natural Gas, LLC (filed with FERC). 4 June 2024. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.