Jewell Ridge Pipeline
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Jewell Ridge Pipeline is a natural gas pipeline lateral in Virginia, operated by East Tennessee Natural Gas, LLC. It runs 32 miles of 20" pipe.
| Jewell Ridge Pipeline | |
|---|---|
| Also called | ETenn Jewell Ridge Lateral[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2][3][4] |
| Status | In service[2][5] |
| Commodity | Natural gas[2][4] |
| Owner and operator | |
| State | Virginia[1][2][4] |
| Counties | Smyth, Tazewell[4] |
| Approved | 8 February 2006[1][4] |
| In service | November 2006[2] or 29 October 2006[5][sources disagree] |
| FERC docket | CP05-413[1] |
| FERC pre-filing docket | PF05-3[1] |
| Technical information | |
| Length | 32 mi[1][2][4] |
| Pipe size | 20"[2][4] |
| Capacity | 275.9 MMcf/d (FERC project list)[1] or 235 MMcf/d additional capacity (EIA)[2] or 235,000 Dth per day[4][sources disagree] |
| Cost | $53 million (EIA estimate; no dollar year given)[2][4] |
| On ProvenHand | |
| Hands listed | 0 |
Jewell Ridge Pipeline is a natural gas pipeline lateral in Virginia, operated by East Tennessee Natural Gas, LLC. It runs 32 miles of 20" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| In service |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Jewell Ridge Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP05-413”. Federal Energy Regulatory Commission. 8 September 2005. Retrieved 3 October 2026.
- “Order issuing certificate, East Tennessee Natural Gas (Jewell Ridge Lateral, CP05-413)”. Federal Energy Regulatory Commission. 8 February 2006. Retrieved 4 October 2026.
- “Notification that the Jewell Ridge Lateral Project facilities were placed in service 10/29/06 (CP05-413)”. Federal Energy Regulatory Commission. 1 November 2006. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.