East Tennessee Natural Gas TVA Project
From the ProvenHand pipeline wiki
East Tennessee Natural Gas TVA Project is a pipeline project in Tennessee, operated by East Tennessee Natural Gas, LLC. It runs 26.5 miles.
| East Tennessee Natural Gas TVA Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owner and operator | |
| State | Tennessee[1] |
| Approved | 21 December 2001[1] |
| FERC docket | CP01-375[1] |
| Technical information | |
| Length | 26.5 mi[1] |
| Capacity | 86 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
East Tennessee Natural Gas TVA Project is a pipeline project in Tennessee, operated by East Tennessee Natural Gas, LLC. It runs 26.5 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on East Tennessee Natural Gas TVA Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.