L-722 Replacement Project
From the ProvenHand pipeline wiki
L-722 Replacement Project is a natural gas pipeline replacement in Ohio, operated by East Tennessee Natural Gas, LLC. It entered service in 2022. It runs 0 miles of 2", 4" pipe.
| L-722 Replacement Project | |
|---|---|
| Also called | Topside Junction Meter Station Modifications Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Operator | |
| State | Ohio[2] |
| In service | 17 November 2022[2] |
| FERC docket | CP22-32[1] |
| Technical information | |
| Length | 0 mi[2] |
| Pipe size | 2", 4"[2] |
| Cost | $2.15 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
L-722 Replacement Project is a natural gas pipeline replacement in Ohio, operated by East Tennessee Natural Gas, LLC. It entered service in 2022. It runs 0 miles of 2", 4" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on L-722 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP22-32”. Federal Energy Regulatory Commission. 17 December 2021. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.