L-722 Replacement Project

From the ProvenHand pipeline wiki

L-722 Replacement Project is a natural gas pipeline replacement in Ohio, operated by East Tennessee Natural Gas, LLC. It entered service in 2022. It runs 0 miles of 2", 4" pipe.

L-722 Replacement Project
Also calledTopside Junction Meter Station Modifications Project[1]
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
Operator
StateOhio[2]
In service17 November 2022[2]
FERC docketCP22-32[1]
Technical information
Length0 mi[2]
Pipe size2", 4"[2]
Cost$2.15 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

L-722 Replacement Project is a natural gas pipeline replacement in Ohio, operated by East Tennessee Natural Gas, LLC. It entered service in 2022. It runs 0 miles of 2", 4" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on L-722 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP22-32”. Federal Energy Regulatory Commission. 17 December 2021. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.