Ridgeline Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Ridgeline Expansion Project is a natural gas pipeline expansion in Tennessee, operated by East Tennessee Natural Gas, LLC. Construction began in 2025.

Ridgeline Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusUnder construction[2][3]
CommodityNatural gas[2][4]
Owner and operator
Operator
Facility project
StateTennessee[2][5]
CountiesFentress, Jackson, Morgan, Overton, Putnam, Roane, Smith, Trousdale[6]
Approved2 April 2025[4][5]
Construction startedOctober 2025[7][8]
FERC docketCP23-516[1]
FERC pre-filing docketPF22-7[1]
Contractors
Technical information
Length122 mi[5] or 122.2 mi[2][6][sources disagree]
Pipe size30"[2][4][8]
Capacity395 MMcf/d (FERC project list)[5] or 300 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$1105 million (EIA estimate; no dollar year given)[2] or US$1.4 billion estimated capital cost[9][sources disagree]
On ProvenHand
Hands listed0

Ridgeline Expansion Project is a natural gas pipeline expansion in Tennessee, operated by East Tennessee Natural Gas, LLC. Construction began in 2025.

Contractorsedit

ContractorWorkScopeSpread
Michels Trenchless, Inc.[10]HDD and boreHDD contractor selected for the Cumberland River crossing; Cumberland River
J. D. Hair & Associates, Inc.[10]HDD design engineerHDD design review for the Cumberland River crossing
WSP USA Inc.[11]Blasting plan consultantSpecifies controlled blasting requirements and reviews the blasting contractor's site-specific plans
Michels Pipeline, Inc.[12]PrimePipe work on the 122.2 miles of 30-inch (union job notification, Sept 2025)
Michels Trenchless, Inc.[13]HDD and boreSix HDDs, possibly more, on the 30-inch pipe (union job notification, Sept 2025)
Michels Trenchless, Inc.[14]Compressor station, M&R and crossover workCompressor station, M&R facilities and crossovers in Trousdale, Jackson, Fentress, Morgan and Roane Counties (union job notification, Sept 2025)
Northern Clearing, Inc.[15]Clearing and reclamation62 miles of land clearing, matting and fencing on Spread 2 (union job notification, Sept 2025)Spread 2
WHM Construction, Inc.[16]Clearing and reclamationClearing, matting and fencing in Smith, Putnam, Overton, Fentress, Morgan and Roane Counties, start Dec 2025 (union job notification, Nov 2025)

Spreads

SpreadDates
Spread 1[3][7]from 1 October 2025
Spread 2[3][15][17]from 1 October 2025

Crossings

FeatureMethodContractor
Cumberland River[10][18]HDDMichels Trenchless, Inc.
Emory River[18]HDD
Harriman Highway[18]HDD
Little Goose Creek and Big Goose Creek[19]HDD
Norfolk Southern Railroad at Lancing[20]HDD
Second Creek[19]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 395 MMcf/d (FERC project list)[5]
  • 300 MMcf/d additional capacity (EIA)[2]
Cost
  • $1105 million (EIA estimate; no dollar year given)[2]
  • US$1.4 billion estimated capital cost[9]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Ridgeline Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP23-516”. Federal Energy Regulatory Commission. 18 July 2023. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Bi-Weekly Status Report No. 30 (Aug 8 to Aug 21, 2026), Ridgeline Expansion Project (CP23-516)”. East Tennessee Natural Gas, LLC (filed with FERC). 4 September 2026. Retrieved 3 October 2026.
  4. “Order Issuing Certificate, East Tennessee Natural Gas, LLC (191 FERC 61,004), Ridgeline Expansion Project”. FERC. 2 April 2025. Retrieved 3 October 2026.
  5. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  6. “Environmental Compliance Monitoring Program weekly summary (Oct 23 to Nov 1, 2025), Ridgeline Expansion Project”. FERC. 17 November 2025. Retrieved 3 October 2026.
  7. “Bi-Weekly Status Report No. 9 (Oct 18 to Oct 31, 2025), Ridgeline Expansion Project (CP23-516)”. East Tennessee Natural Gas, LLC (filed with FERC). 7 November 2025. Retrieved 3 October 2026.
  8. “Ridgeline Expansion Project (project page)”. Enbridge Inc. Retrieved 3 October 2026.
  9. “Enbridge Inc. Form 10-Q for the quarter ended June 30, 2026 (growth projects table)”. Enbridge Inc. (filed with the SEC). 31 July 2026. Retrieved 3 October 2026.
  10. “Implementation Plan supplement (Condition 13, Cumberland River HDD), Ridgeline Expansion Project (CP23-516)”. East Tennessee Natural Gas, LLC (filed with FERC). 29 July 2025. Retrieved 3 October 2026.
  11. “Implementation Plan supplement (Revised Controlled Blasting Plan), Ridgeline Expansion Project (CP23-516)”. East Tennessee Natural Gas, LLC (filed with FERC). 2 October 2025. Retrieved 3 October 2026.
  12. “Job notification: Michels Pipeline, Ridgeline Expansion (Enbridge), Tennessee”. Teamsters National Pipeline (union job notification database). 26 September 2025. Retrieved 3 October 2026.
  13. “Job notification: Michels Trenchless, Ridgeline Expansion (Enbridge), six HDDs”. Teamsters National Pipeline (union job notification database). 26 September 2025. Retrieved 3 October 2026.
  14. “Job notification: Michels Trenchless, Ridgeline Expansion (Enbridge), compressor station, M&R facilities and crossovers”. Teamsters National Pipeline (union job notification database). 26 September 2025. Retrieved 3 October 2026.
  15. “Job notification: Northern Clearing Inc., Enbridge Ridgeline Spread 2, 62 miles of clearing”. Teamsters National Pipeline (union job notification database). 30 September 2025. Retrieved 3 October 2026.
  16. “Job notification: WHM Construction, Inc., Ridgeline Expansion (Enbridge), clearing, matting and fencing”. Teamsters National Pipeline (union job notification database). 6 November 2025. Retrieved 3 October 2026.
  17. “Bi-Weekly Status Report No. 11 (Nov 15 to Nov 28, 2025), Ridgeline Expansion Project (CP23-516)”. East Tennessee Natural Gas, LLC (filed with FERC). 5 December 2025. Retrieved 3 October 2026.
  18. “Bi-Weekly Status Report (period ending March 2026), Ridgeline Expansion Project (CP23-516)”. East Tennessee Natural Gas, LLC (filed with FERC). 16 March 2026. Retrieved 3 October 2026.
  19. “Bi-Weekly Status Report No. 12 (Nov 29 to Dec 12, 2025), Ridgeline Expansion Project (CP23-516)”. East Tennessee Natural Gas, LLC (filed with FERC). 22 December 2025. Retrieved 3 October 2026.
  20. “Bi-Weekly Status Report No. 26, Ridgeline Expansion Project (CP23-516)”. East Tennessee Natural Gas, LLC (filed with FERC). 10 July 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.