Northeastern Tennessee Proj (NET Proj is a natural gas pipeline lateral in Tennessee and Virginia, operated by East Tennessee Natural Gas, LLC. Construction began in 2011.

Northeastern Tennessee Proj (NET Proj
Also calledNortheastern Tennessee Project[1]
General information
KindPipeline project[1]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
Operator
StatesTennessee, Virginia[1][2]
CountiesTennessee: Greene, Hawkins, Sullivan, Washington
Virginia: Washington
[3]
Approved25 October 2010[1][3]
Construction started2011[4]
In service31 August 2011[2] or 1 September 2011[5][sources disagree]
FERC docketCP10-89[1]
FERC pre-filing docketPF09-13[1]
Technical information
Length28.1 mi[1] or 28 mi[2][sources disagree]
Pipe size24"[2][3]
Capacity150 MMcf/d (FERC project list)[1][2]
Cost$135 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Northeastern Tennessee Proj (NET Proj is a natural gas pipeline lateral in Tennessee and Virginia, operated by East Tennessee Natural Gas, LLC. Construction began in 2011.

Inspection

FirmScope
Tetra Tech, Inc.[6]FERC's contractor on the environmental compliance inspection of the project (April 2012)

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 31 August 2011[2]
  • 1 September 2011[5]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Northeastern Tennessee Proj (NET Proj? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate and Approving Abandonment, Northeastern Tennessee Project (CP10-89)”. Federal Energy Regulatory Commission. 25 October 2010. Retrieved 4 October 2026.
  4. “Biweekly Status Report, Northeastern Tennessee Project (CP10-89)”. East Tennessee Natural Gas, LLC (filed with FERC). 11 May 2011. Retrieved 4 October 2026.
  5. “Notice of Commencement of Service, NET Project (CP10-89)”. East Tennessee Natural Gas, LLC (filed with FERC). 12 September 2011. Retrieved 4 October 2026.
  6. “Environmental Compliance Inspection Report, Northeastern Tennessee (NET) Project, inspection of 2012-04-26 (CP10-89)”. Federal Energy Regulatory Commission. 5 June 2012. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.