Northeastern Tennessee Proj (NET Proj is a natural gas pipeline lateral in Tennessee and Virginia, operated by East Tennessee Natural Gas, LLC. Construction began in 2011.
| Northeastern Tennessee Proj (NET Proj | |
|---|---|
| Also called | Northeastern Tennessee Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Operator | |
| States | Tennessee, Virginia[1][2] |
| Counties | Tennessee: Greene, Hawkins, Sullivan, Washington Virginia: Washington[3] |
| Approved | 25 October 2010[1][3] |
| Construction started | 2011[4] |
| In service | 31 August 2011[2] or 1 September 2011[5][sources disagree] |
| FERC docket | CP10-89[1] |
| FERC pre-filing docket | PF09-13[1] |
| Technical information | |
| Length | 28.1 mi[1] or 28 mi[2][sources disagree] |
| Pipe size | 24"[2][3] |
| Capacity | 150 MMcf/d (FERC project list)[1][2] |
| Cost | $135 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Northeastern Tennessee Proj (NET Proj is a natural gas pipeline lateral in Tennessee and Virginia, operated by East Tennessee Natural Gas, LLC. Construction began in 2011.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[6] | FERC's contractor on the environmental compliance inspection of the project (April 2012) |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Northeastern Tennessee Proj (NET Proj? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Northeastern Tennessee Project (CP10-89)”. Federal Energy Regulatory Commission. 25 October 2010. Retrieved 4 October 2026.
- “Biweekly Status Report, Northeastern Tennessee Project (CP10-89)”. East Tennessee Natural Gas, LLC (filed with FERC). 11 May 2011. Retrieved 4 October 2026.
- “Notice of Commencement of Service, NET Project (CP10-89)”. East Tennessee Natural Gas, LLC (filed with FERC). 12 September 2011. Retrieved 4 October 2026.
- “Environmental Compliance Inspection Report, Northeastern Tennessee (NET) Project, inspection of 2012-04-26 (CP10-89)”. Federal Energy Regulatory Commission. 5 June 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.