Ridgetop to Dixon Springs Replacement Project

From the ProvenHand pipeline wiki

Ridgetop to Dixon Springs Replacement Project is a natural gas pipeline replacement in Tennessee, operated by East Tennessee Natural Gas, LLC. Construction began in 2023.

Ridgetop to Dixon Springs Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusIn service[3]
CommodityNatural gas[1]
Owner and operator
StateTennessee[1]
CountiesSumner[1]
Construction started19 July 2023[4]
FERC docketCP23-480[2]
Technical information
Pipe size22"[1]
Cost$16,000,000[1]
On ProvenHand
Hands listed0

Ridgetop to Dixon Springs Replacement Project is a natural gas pipeline replacement in Tennessee, operated by East Tennessee Natural Gas, LLC. Construction began in 2023.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Ridgetop to Dixon Springs Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report, Ridgetop to Dixon Springs Replacement Project (CP23-480)”. FERC. 17 July 2023. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP23-480”. Federal Energy Regulatory Commission. 12 May 2023. Retrieved 3 October 2026.
  3. “Final Weekly Report, Ridgetop to Dixon Springs Replacement Project (CP23-480)”. East Tennessee Natural Gas, LLC (filed with FERC). 20 November 2023. Retrieved 4 October 2026.
  4. “Weekly Report No. 1 (July 2023), Ridgetop to Dixon Springs Replacement Project (CP23-480)”. East Tennessee Natural Gas, LLC (filed with FERC). 3 August 2023. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.