Line 427 Phase II

From the ProvenHand pipeline wiki

Line 427 Phase II is a pipeline project, operated by Duke Energy/Piedmont. It runs 20 miles of 16" pipe.

Line 427 Phase II
General information
KindPipeline project[1]
OperatorDuke Energy/Piedmont[1]
Operator
Contractors
Technical information
Length20 mi[1]
Pipe size16"[1]
On ProvenHand
Hands listed0

Line 427 Phase II is a pipeline project, operated by Duke Energy/Piedmont. It runs 20 miles of 16" pipe.

Contractorsedit

ContractorWorkScope
M.G. Dyess, LLC[1]PrimePipeline and station work: 20 miles of 16-inch, 13 meter/regulator stations and 7 HDDs, 98% complete (listed as a current project, October 2019)

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line 427 Phase II? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Current Projects - MG Dyess (October 2019 capture)”. M.G. Dyess, Inc. Archived from the original on 16 October 2019. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.