Dominion Hub III Project
From the ProvenHand pipeline wiki
Dominion Hub III Project is a natural gas pipeline expansion in Pennsylvania and West Virginia, operated by Dominion Transmission, Inc.. It entered service in 2010. It runs 9.4 miles of 24" pipe.
| Dominion Hub III Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Pennsylvania, West Virginia[1][2] |
| Counties | Pennsylvania: Greene West Virginia: Wetzel[3] |
| Approved | 6 October 2009[1] |
| In service | 26 October 2010[2] |
| FERC docket | CP09-18[1] |
| Technical information | |
| Length | 9.4 mi[1][2] |
| Pipe size | 24"[2] |
| Capacity | 224.3 MMcf/d (FERC project list)[1] or 224 MMcf/d additional capacity (EIA)[2][sources disagree] |
| Cost | $34.7 million (EIA estimate; no dollar year given)[2][3] |
| On ProvenHand | |
| Hands listed | 0 |
Dominion Hub III Project is a natural gas pipeline expansion in Pennsylvania and West Virginia, operated by Dominion Transmission, Inc.. It entered service in 2010. It runs 9.4 miles of 24" pipe.
Inspection
| Firm | Scope | Years |
|---|---|---|
| Tetra Tech, Inc.[4][5] | FERC's contractor for environmental compliance inspections during construction | 1 June 2010 – 1 September 2010 |
Spreads
| Spread |
|---|
| Single spread[6] |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Dominion Hub III Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, Dominion Transmission, Inc., Dominion Hub III Project (CP09-18)”. Federal Energy Regulatory Commission. 6 October 2009. Retrieved 4 October 2026.
- “Environmental Compliance Inspection Report, June 1, 2010, Dominion Hub III Project (CP09-18)”. Federal Energy Regulatory Commission. 17 June 2010. Retrieved 4 October 2026.
- “Environmental Compliance Inspection Report, September 10, 2010, Dominion Hub III Project (CP09-18)”. Federal Energy Regulatory Commission. 20 October 2010. Retrieved 4 October 2026.
- “Implementation Plan, Dominion Hub III Project (CP09-18)”. Dominion Transmission, Inc. (filed with FERC). 30 December 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.