Dominion Hub III Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Dominion Hub III Project is a natural gas pipeline expansion in Pennsylvania and West Virginia, operated by Dominion Transmission, Inc.. It entered service in 2010. It runs 9.4 miles of 24" pipe.

Dominion Hub III Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StatesPennsylvania, West Virginia[1][2]
CountiesPennsylvania: Greene
West Virginia: Wetzel
[3]
Approved6 October 2009[1]
In service26 October 2010[2]
FERC docketCP09-18[1]
Technical information
Length9.4 mi[1][2]
Pipe size24"[2]
Capacity224.3 MMcf/d (FERC project list)[1] or 224 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$34.7 million (EIA estimate; no dollar year given)[2][3]
On ProvenHand
Hands listed0

Dominion Hub III Project is a natural gas pipeline expansion in Pennsylvania and West Virginia, operated by Dominion Transmission, Inc.. It entered service in 2010. It runs 9.4 miles of 24" pipe.

Inspection

FirmScopeYears
Tetra Tech, Inc.[4][5]FERC's contractor for environmental compliance inspections during construction1 June 2010 – 1 September 2010

Spreads

Spread
Single spread[6]

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 224.3 MMcf/d (FERC project list)[1]
  • 224 MMcf/d additional capacity (EIA)[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Dominion Hub III Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Dominion Transmission, Inc., Dominion Hub III Project (CP09-18)”. Federal Energy Regulatory Commission. 6 October 2009. Retrieved 4 October 2026.
  4. “Environmental Compliance Inspection Report, June 1, 2010, Dominion Hub III Project (CP09-18)”. Federal Energy Regulatory Commission. 17 June 2010. Retrieved 4 October 2026.
  5. “Environmental Compliance Inspection Report, September 10, 2010, Dominion Hub III Project (CP09-18)”. Federal Energy Regulatory Commission. 20 October 2010. Retrieved 4 October 2026.
  6. “Implementation Plan, Dominion Hub III Project (CP09-18)”. Dominion Transmission, Inc. (filed with FERC). 30 December 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.