H-162 Pipeline Replacement Project is a natural gas pipeline replacement in West Virginia, operated by Dominion Transmission, Inc.. It runs 27.7 miles of 20" pipe.
| H-162 Pipeline Replacement Project | |
|---|---|
| General information | |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | West Virginia[4] |
| Counties | Clay, Kanawha[4] |
| Approved | 21 August 2009[1] |
| FERC docket | CP09-44[3] |
| Technical information | |
| Length | 27.7 mi[1] |
| Pipe size | 20"[1] |
| Cost | $105,665,054 (estimated total construction cost stated in the certificate order)[1] |
| On ProvenHand | |
| Hands listed | 0 |
H-162 Pipeline Replacement Project is a natural gas pipeline replacement in West Virginia, operated by Dominion Transmission, Inc.. It runs 27.7 miles of 20" pipe.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[4] | FERC contractor on FERC's April 2011 environmental compliance field inspection of the project |
Spreads
| Spread |
|---|
| Mainline[5] |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on H-162 Pipeline Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Order Issuing Certificate and Determining Jurisdictional Status of Facilities, Dominion Transmission, Inc. (CP09-44)”. Federal Energy Regulatory Commission. 21 August 2009. Retrieved 4 October 2026.
- “Letter order granting in-service approval, H-162 Pipeline Replacement Project (CP09-44)”. Federal Energy Regulatory Commission. 15 October 2010. Retrieved 4 October 2026.
- “FERC eLibrary docket CP09-44”. Federal Energy Regulatory Commission. 8 January 2009. Retrieved 3 October 2026.
- “Environmental Compliance Monitoring Report, H-162 Pipeline Replacement Project, April 13-14, 2011 (CP09-44)”. Federal Energy Regulatory Commission. 12 May 2011. Retrieved 4 October 2026.
- “Environmental Biweekly Status Report, H-162 Pipeline Replacement Project (CP09-44)”. Dominion Transmission, Inc. (filed with FERC). 1 December 2010. Retrieved 4 October 2026.