Driftwood Line 200 and 300 Project Phase 1

From the ProvenHand pipeline wiki

Driftwood Line 200 and 300 Project Phase 1 is a natural gas pipeline in Louisiana, operated by Driftwood LNG Pipeline LLC. Construction began in 2026. It runs 36.9 miles of 42" pipe.

Driftwood Line 200 and 300 Project Phase 1
General information
KindPipeline project[1]
Project typeNew build[1]
StatusUnder construction[1]
CommodityNatural gas[1]
Operator
StateLouisiana[1]
CountiesBeauregard, Calcasieu[2]
Approved21 April 2023[2]
Construction started10 September 2026[3]
FERC docketCP21-465[1]
Contractors
Technical information
Length36.9 mi[1]
Pipe size42"[1]
Capacity2400 MMcf/d additional capacity (EIA)[1]
Cost$426 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Driftwood Line 200 and 300 Project Phase 1 is a natural gas pipeline in Louisiana, operated by Driftwood LNG Pipeline LLC. Construction began in 2026. It runs 36.9 miles of 42" pipe.

Contractorsedit

ContractorWorkScope
Hoover & Keith Inc.[4]Acoustical consultant (compressor station noise control assessment)Noise control assessment for Phase 1 of the Indian Bayou Compressor Station (with a compressor building)

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Driftwood Line 200 and 300 Project Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Order Issuing Certificate, Driftwood Pipeline LLC, Line 200 and Line 300 Project (CP21-465), 183 FERC 61,049”. Federal Energy Regulatory Commission. 21 April 2023. Retrieved 3 October 2026.
  3. “Bi-Weekly Construction Status Report (9/8/2026 to 9/22/2026), Line 200 and Line 300 Project (CP21-465)”. Driftwood Pipeline LLC (filed with FERC). 28 September 2026. Retrieved 3 October 2026.
  4. “Supplemental information to the Implementation Plan, with rare plant species survey report, Line 200 and Line 300 Project (CP21-465)”. Driftwood Pipeline LLC (filed with FERC); survey report prepared by Perennial Environmental Services, LLC. 30 July 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.