Hoover & Keith Inc.

From the ProvenHand pipeline wiki

Hoover & Keith Inc. is a pipeline contractor.

Hoover & Keith Inc.
General information
Industry
PLCANot a PLCA member as of 3 October 2026[4]
On ProvenHand
Hands listed0

Hoover & Keith Inc. is a pipeline contractor.

This company article is a stub. You can help ProvenHand by expanding it.

Projects

As contractor

ProjectWorkScopeProject built
Driftwood Line 200 and 300 Project Phase 1[2]Acoustical consultant (compressor station noise control assessment)Noise control assessment for Phase 1 of the Indian Bayou Compressor Station (with a compressor building)2026
Texas to Louisiana Energy Pathway[1]Acoustical consulting (sound surveys and noise report)Pre-construction sound survey at Compressor Station 40; noise report for Compressor Station 332024–2025
Bennington Compressor Station Project[5]Acoustic consultant (post-construction sound survey)Post-construction sound survey of the Bennington compressor station, March 2011 (report dated April 2011)2011
Bennington Compressor Station Project Phase I[5]Acoustic consultant (post-construction sound survey)Post-construction sound survey of the Bennington compressor station, March 2011 (report dated April 2011)2009
Texas Eastern Transmission Line 31 Expansion Project[3]Acoustical consultant (noise analysis)Noise analysis of the Ridgeland Compressor Station at full load (July 2025), cited in the EA

References

  1. “Implementation Plan, Texas to Louisiana Energy Pathway Project (CP22-495)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 20 February 2024. Retrieved 3 October 2026.
  2. “Supplemental information to the Implementation Plan, with rare plant species survey report, Line 200 and Line 300 Project (CP21-465)”. Driftwood Pipeline LLC (filed with FERC); survey report prepared by Perennial Environmental Services, LLC. 30 July 2026. Retrieved 3 October 2026.
  3. “Environmental Assessment for the Line 31 Expansion Project (CP26-75)”. Federal Energy Regulatory Commission. 24 July 2026. Retrieved 3 October 2026.
  4. “PLCA Member Directory”. Pipe Line Contractors Association. Retrieved 3 October 2026.
  5. “Post-Construction Noise Survey Report, Bennington Compressor Station Project Phases I and II (CP08-57, CP09-441)”. Enogex LLC (filed with FERC); survey by Hoover & Keith Inc. 7 April 2011. Retrieved 4 October 2026.