Eastern Gas Transmission and Storage LN-19 Pipeline Project is a natural gas pipeline replacement, operated by Eastern Gas Transmission and Storage, Inc.. It runs 12.3 miles of 20" pipe.
| Eastern Gas Transmission and Storage LN-19 Pipeline Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Counties | Armstrong, Westmoreland[2] |
| FERC docket | CP26-184[1] |
| Contractors | |
| Technical information | |
| Length | 12.3 mi[2] |
| Pipe size | 20"[2] |
| Cost | $60,000,000.00[2] |
| On ProvenHand | |
| Hands listed | 0 |
Eastern Gas Transmission and Storage LN-19 Pipeline Project is a natural gas pipeline replacement, operated by Eastern Gas Transmission and Storage, Inc.. It runs 12.3 miles of 20" pipe.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Right-Of-Way Clearing & Maintenance, Inc.[3] | Clearing and reclamation | Clearing; listed as LN-19 in Westmoreland and Armstrong Counties PA (Ace Pipeline/BHE) | until 1 January 2026 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Eastern Gas Transmission and Storage LN-19 Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-184”. Federal Energy Regulatory Commission. 6 April 2026. Retrieved 3 October 2026.
- “Eastern Gas Transmission and Storage, Inc. submits 2.55(b) Notification of Natural Gas Facilities Replacement for the LN-19 Pipeline Project under CP26-184.”. Eastern Gas Transmission and Storage, Inc. (filed with FERC). 6 April 2026. Retrieved 3 October 2026.
- “Projects”. Right-Of-Way Clearing & Maintenance, Inc. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.