FGT Phase VI Project

From the ProvenHand pipeline wiki

FGT Phase VI Project is a natural gas pipeline expansion in Alabama and Florida. It entered service in 2003. It runs 33.3 miles of 36" pipe.

FGT Phase VI Project
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
StatesAlabama, Florida[1]
In serviceDecember 2003[1]
FERC docketCP02-27[1]
Contractors
Technical information
Length33.3 mi[1]
Pipe size36"[1]
Capacity121 MMcf/d additional capacity (EIA)[1]
Cost$105 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

FGT Phase VI Project is a natural gas pipeline expansion in Alabama and Florida. It entered service in 2003. It runs 33.3 miles of 36" pipe.

Contractorsedit

ContractorWorkScopeYears
Latex Construction[2]PrimePhase VI Expansion: 1.3 mi of 6-in loop, 6.8 mi of 16-in loop, 20 mi of 30-in loop, 3 mi of 36-in loop, 843 ft of 30-in and 500 ft of 24-in relocation; Lake, Orange, Brevard, Bradford, Clay, Baldwin, Mobile, Suwannee and Washington Counties; 2003until 1 January 2003

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on FGT Phase VI Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Latex Construction Company - Completed Projects (2005-2006 site)”. Latex Construction Company. Archived from the original on 27 November 2005. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.