Florida Gas Transmission East-West Project is a natural gas pipeline lateral in Louisiana and Texas, operated by Florida Gas Transmission Company, LLC. Construction began in 2018 and the line entered service in 2019. It runs 24.7 miles of 12" pipe.

Florida Gas Transmission East-West Project
Also calledEast-West Project[1]
General information
KindPipeline project[2]
Project typeLateral[1]
StatusIn service[1]
CommodityNatural gas[1]
Owner and operator
Operator
StatesLouisiana, Texas[1][2]
CountiesMatagorda, Wharton[3]
Approved5 April 2018[2]
Construction started5 July 2018[4]
In service22 January 2019[1]
FERC docketCP17-8[2]
Technical information
Length24.7 mi[1][2]
Pipe size12"[3]
Capacity275 MMcf/d (FERC project list)[1][2]
Cost$68.9 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Florida Gas Transmission East-West Project is a natural gas pipeline lateral in Louisiana and Texas, operated by Florida Gas Transmission Company, LLC. Construction began in 2018 and the line entered service in 2019. It runs 24.7 miles of 12" pipe.

Inspection

FirmScope
Tetra Tech, Inc.[5]FERC's third-party contractor on the Commission's construction/environmental inspections

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Florida Gas Transmission East-West Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  4. “Bi-Weekly Environmental Status Report No. 1, East-West Project (CP17-8)”. Florida Gas Transmission Company, LLC (filed with FERC). 20 July 2018. Retrieved 4 October 2026.
  5. “Construction Inspection Report, East-West Project (CP17-8)”. Federal Energy Regulatory Commission. 15 August 2018. Retrieved 4 October 2026.