Giles County Project is a natural gas pipeline, operated by Columbia Gas Transmission, LLC. It entered service in 2014.
| Giles County Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] or Loop[2][sources disagree] |
| Status | In service[1][3] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | VA[1] or VA, WV[5][sources disagree] |
| Counties | Virginia: Giles West Virginia: Monroe, Summers[5] |
| Approved | 6 February 2014[2] |
| In service | 24 September 2014[1][3] |
| FERC docket | CP13-125[1] |
| Technical information | |
| Length | 13 mi[1] or 12.6 mi[2][sources disagree] |
| Pipe size | 8"[1][2] |
| Capacity | 46 MMcf/d additional capacity (EIA)[1] |
| Cost | approximately $22,700,000 (estimate in the certificate order)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Giles County Project is a natural gas pipeline, operated by Columbia Gas Transmission, LLC. It entered service in 2014.
Inspection
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Giles County Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, Columbia Gas Transmission, LLC, Giles County Project (CP13-125)”. Federal Energy Regulatory Commission. 6 February 2014. Retrieved 4 October 2026.
- “FERC Construction Inspection Report, Giles County Project, October 21, 2014 (CP13-125)”. Federal Energy Regulatory Commission. 21 October 2014. Retrieved 4 October 2026.
- “FERC eLibrary docket CP13-125”. Federal Energy Regulatory Commission. 5 April 2013. Retrieved 3 October 2026.
- “FERC Field Inspection Report, Giles County Project, April 1, 2014 (CP13-125)”. Federal Energy Regulatory Commission. 1 April 2014. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.