Giles County Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Giles County Project is a natural gas pipeline, operated by Columbia Gas Transmission, LLC. It entered service in 2014.

Giles County Project
General information
KindPipeline project[1]
Project typeExpansion[1] or Loop[2][sources disagree]
StatusIn service[1][3]
CommodityNatural gas[1]
Operator
Owner and operator
StateVA[1] or VA, WV[5][sources disagree]
CountiesVirginia: Giles
West Virginia: Monroe, Summers
[5]
Approved6 February 2014[2]
In service24 September 2014[1][3]
FERC docketCP13-125[1]
Technical information
Length13 mi[1] or 12.6 mi[2][sources disagree]
Pipe size8"[1][2]
Capacity46 MMcf/d additional capacity (EIA)[1]
Costapproximately $22,700,000 (estimate in the certificate order)[2]
On ProvenHand
Hands listed0

Giles County Project is a natural gas pipeline, operated by Columbia Gas Transmission, LLC. It entered service in 2014.

Inspection

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type
Length
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Giles County Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Order Issuing Certificate, Columbia Gas Transmission, LLC, Giles County Project (CP13-125)”. Federal Energy Regulatory Commission. 6 February 2014. Retrieved 4 October 2026.
  3. “FERC Construction Inspection Report, Giles County Project, October 21, 2014 (CP13-125)”. Federal Energy Regulatory Commission. 21 October 2014. Retrieved 4 October 2026.
  4. “FERC eLibrary docket CP13-125”. Federal Energy Regulatory Commission. 5 April 2013. Retrieved 3 October 2026.
  5. “FERC Field Inspection Report, Giles County Project, April 1, 2014 (CP13-125)”. Federal Energy Regulatory Commission. 1 April 2014. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.