Golden Triangle Storage Project

From the ProvenHand pipeline wiki

Golden Triangle Storage Project is a natural gas pipeline in Texas, operated by Golden Triangle Storage, LLC. Construction began in 2008 and the line entered service in 2010.

Golden Triangle Storage Project
General information
KindPipeline project[1]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StateTexas[3]
CountiesJefferson, Orange[3]
Approved31 December 2007[3]
Construction startedMay 2008[4]
In service16 September 2010[2]
FERC docketCP07-414[1]
Contractors
Technical information
Pipe size24"[3]
Horsepower added14,205 hp[3]
On ProvenHand
Hands listed0

Golden Triangle Storage Project is a natural gas pipeline in Texas, operated by Golden Triangle Storage, LLC. Construction began in 2008 and the line entered service in 2010.

Contractorsedit

ContractorWorkScopeYears
WHC[5]PrimeGeneral contractor; mobilized equipment for pipeline and facilities construction (status reports, May-June 2008)from 1 May 2008
Bandera Resources[4]soil remediationRemediation contractor: cleanup of documented soil contamination areas in the 2008 construction footprintfrom 1 May 2008
Wortech[6]SurveySurveyors (environmental and safety training roster, May-June 2008)from 1 May 2008
Tanner Construction[5]storage cavern site construction (pad, clearing, piling)Storage Cavern #1 construction contractor: clay site pad, clearing and piling (June 2008)from 1 June 2008

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Golden Triangle Storage Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP07-414”. Federal Energy Regulatory Commission. 29 June 2007. Retrieved 3 October 2026.
  2. “Request for Extension of Time to Complete Construction of Jurisdictional Facilities, Golden Triangle Storage, LLC (CP07-414 et al.)”. Golden Triangle Storage, LLC (filed with FERC). 31 October 2024. Retrieved 4 October 2026.
  3. “Order Issuing Certificates, Golden Triangle Storage, Inc. (CP07-414 et al.)”. Federal Energy Regulatory Commission. 31 December 2007. Retrieved 4 October 2026.
  4. “Weekly Status Report No. 1 (May 19-25, 2008), Golden Triangle Storage Project (CP07-414 et al.)”. Golden Triangle Storage, Inc. (filed with FERC). 30 May 2008. Retrieved 4 October 2026.
  5. “Weekly Status Report No. 3 (June 2-8, 2008), Golden Triangle Storage Project (CP07-414 et al.)”. Golden Triangle Storage, Inc. (filed with FERC). 12 June 2008. Retrieved 4 October 2026.
  6. “Weekly Status Report No. 2 (May 26-June 1, 2008), Golden Triangle Storage Project (CP07-414 et al.)”. Golden Triangle Storage, Inc. (filed with FERC). 5 June 2008. Retrieved 4 October 2026.