WHC
From the ProvenHand pipeline wiki
WHC is a pipeline contractor.
| WHC | |
|---|---|
| General information | |
| Industry | |
| PLCA | Not a PLCA member as of 3 October 2026[3] |
| On ProvenHand | |
| Hands listed | 0 |
WHC is a pipeline contractor.
This company article is a stub. You can help ProvenHand by expanding it.
Projects
As contractor
| Project | Work | Scope | Spread | Years | Project built |
|---|---|---|---|---|---|
| TransCameron Pipeline[1] | Mechanized welding | Mechanized welding (RMS MOWII system) of 31 km of 42-inch pipe on the Venture Global TransCameron pipeline | 2021 | ||
| Golden Triangle Storage Project[2] | Prime | General contractor; mobilized equipment for pipeline and facilities construction (status reports, May-June 2008) | from 1 May 2008 | 2008–2010 | |
| Trident Intrastate Pipeline[1] | Prime | Spread 3: 27 km of 42-inch, wall 15.2 to 21.9 mm, X-70 (RMS project list names the firm only as WHC) | Spread 3 |
Spreads
Spreads this company built as the prime contractor.
| Project | Spread |
|---|---|
| Trident Intrastate Pipeline | Spread 3[1] |
References
- “Projects (MOWII)”. RMS Welding Systems. Retrieved 3 October 2026.
- “Weekly Status Report No. 3 (June 2-8, 2008), Golden Triangle Storage Project (CP07-414 et al.)”. Golden Triangle Storage, Inc. (filed with FERC). 12 June 2008. Retrieved 4 October 2026.