Gulfstream Natural Gas System Phase III Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Gulfstream Natural Gas System Phase III Expansion Project is a pipeline project, operated by Gulfstream Natural Gas System LLC.

Gulfstream Natural Gas System Phase III Expansion Project
General information
KindPipeline project[1]
Owner and operator
Facility projects
StateFL[1] or AL, FL, MS[1][sources disagree]
Approved7 June 2007[1] or 21 February 2001[1][sources disagree]
FERC docketCP00-6[1]
Technical information
Length34.3 mi[1] or 753 mi[1][sources disagree]
Capacity345 MMcf/d (FERC project list)[1] or 1130 MMcf/d (FERC project list)[1][sources disagree]
On ProvenHand
Hands listed0

Gulfstream Natural Gas System Phase III Expansion Project is a pipeline project, operated by Gulfstream Natural Gas System LLC.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Approved
  • 7 June 2007[1]
  • 21 February 2001[1]
Capacity
  • 345 MMcf/d (FERC project list)[1]
  • 1130 MMcf/d (FERC project list)[1]
Length
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Gulfstream Natural Gas System Phase III Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.