Gulfstream Pipeline Phase 3a
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Gulfstream Pipeline Phase 3a is a natural gas pipeline lateral in Florida, operated by Gulfstream Natural Gas System LLC. Construction began in 2008.
| Gulfstream Pipeline Phase 3a | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Part of | Gulfstream Natural Gas System Phase III Expansion Project[1] |
| State | Florida[1] |
| Counties | Martin, Palm Beach[2] |
| Approved | 7 June 2007[3] |
| Construction started | 4 April 2008[4] |
| In service | September 2008[1][5] or 1 September 2008[3][sources disagree] |
| FERC docket | CP00-6[1] |
| Technical information | |
| Length | 34.3 mi[1] or 35 mi[6][sources disagree] |
| Pipe size | 30"[1][6] |
| Capacity | 185 MMcf/d additional capacity (EIA)[1] |
| Cost | $129 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Gulfstream Pipeline Phase 3a is a natural gas pipeline lateral in Florida, operated by Gulfstream Natural Gas System LLC. Construction began in 2008.
Pipe mills
| Mill | Diameter | Grade | Years |
|---|---|---|---|
| Berg Pipe Panama City Corp.[7] | 30 in | X70 | 1 January 2007 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gulfstream Pipeline Phase 3a? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Gulfstream Phase III Project abbreviated application for amendment of certificate (CP00-6)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 15 August 2006. Retrieved 4 October 2026.
- “Gulfstream Phase III commencement of service notification (CP00-6-014)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 2 September 2008. Retrieved 4 October 2026.
- “Gulfstream notice that construction of the Phase III Project commenced (CP00-6), eLibrary record”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 14 April 2008. Retrieved 4 October 2026.
- “Spectra Energy Partners third quarter 2008 earnings release (8-K exhibit 99.1)”. Spectra Energy Partners, LP (filed with the SEC). 7 November 2008. Retrieved 4 October 2026.
- “Spectra Energy Partners, LP annual report on Form 10-K for the year ended December 31, 2007”. Spectra Energy Partners, LP (filed with the SEC). 25 March 2008. Retrieved 4 October 2026.
- “Project List (BSPC Reference List), bergpipe.com, 2009 capture”. Berg Steel Pipe Corp. (Berg Pipe). Archived from the original on 16 July 2009. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.