H-305 Pipeline Project
From the ProvenHand pipeline wiki
H-305 Pipeline Project is a natural gas pipeline lateral in Pennsylvania, operated by Equitrans, L.P.. It runs 3.4 miles of 24" pipe.
| H-305 Pipeline Project | |
|---|---|
| General information | |
| Project type | Lateral[1] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Pennsylvania[2] |
| Counties | Greene[2] |
| FERC docket | CP14-130[3] |
| Technical information | |
| Length | 3.4 mi[2] |
| Pipe size | 24"[2] |
| Capacity | maximum capacity of 50,000 dekatherms per day[1] |
| Cost | $13,800,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
H-305 Pipeline Project is a natural gas pipeline lateral in Pennsylvania, operated by Equitrans, L.P.. It runs 3.4 miles of 24" pipe.
Inspection
| Firm | Scope |
|---|---|
| Tetra Tech, Inc.[2] | FERC's contractor for the restoration inspection of October 13, 2015 |
| NewEarth Ecological Consulting[2] | subcontractor to Tetra Tech that performed the restoration inspection of October 13, 2015 (the report spells it 'NewEarth Ecological') |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on H-305 Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, H-305 Pipeline Project, Equitrans, L.P. (CP14-130)”. FERC. 9 June 2014. Retrieved 4 October 2026.
- “FERC Field Inspection Report, H-305 Pipeline Project (inspection of October 13, 2015), Equitrans, L.P. (CP14-130)”. FERC. 20 November 2015. Retrieved 4 October 2026.
- “FERC eLibrary docket CP14-130”. Federal Energy Regulatory Commission. 1 April 2014. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.