H-312 Pipeline Project is a natural gas pipeline in West Virginia, operated by Equitrans, L.P.. It entered service in 2015. It runs 9.3 miles of 12" pipe.

H-312 Pipeline Project
General information
StatusIn service[1]
CommodityNatural gas[1]
Owner and operator
StateWest Virginia[1][3]
CountiesHarrison[1][3]
In service1 July 2015[1]
FERC docketCP14-523[2]
Technical information
Length9.3 mi[1]
Pipe size12"[1]
Cost$26,942,253[3]
On ProvenHand
Hands listed0

H-312 Pipeline Project is a natural gas pipeline in West Virginia, operated by Equitrans, L.P.. It entered service in 2015. It runs 9.3 miles of 12" pipe.

Inspection

FirmScope
Tetra Tech, Inc.[1]FERC's contractor for the restoration inspection of June 6, 2016

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on H-312 Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC Field Inspection Report, H-312 Pipeline Project (inspection of June 6, 2016), Equitrans, L.P. (CP14-523)”. FERC. 1 July 2016. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP14-523”. Federal Energy Regulatory Commission. 18 July 2014. Retrieved 3 October 2026.
  3. “Environmental Assessment Report, H-312 Pipeline Project, Equitrans, L.P. (CP14-523)”. FERC. 26 September 2014. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.