Henderson County Expansion Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Henderson County Expansion Project is a natural gas pipeline in Indiana and Kentucky, operated by Texas Gas Transmission, LLC. It runs 24 miles of 20" pipe.
| Henderson County Expansion Project | |
|---|---|
| Also called | Henderson Expansion Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Lateral[3] or Expansion[1][sources disagree] |
| Status | In service[3][4] |
| Commodity | Natural gas[3][5] |
| Owner and operator | |
| Facility project | |
| States | Indiana, Kentucky[2][3][5] |
| Counties | Indiana: Johnson, Posey Kentucky: Henderson, Webster[5] |
| Approved | 20 October 2022[2][5] |
| In service | May 2024[3] or 1 May 2024[4][sources disagree] |
| FERC docket | CP21-467[2] |
| Technical information | |
| Length | 24 mi[2][3][5] |
| Pipe size | 20"[3] |
| Capacity | 220 MMcf/d (FERC project list)[2][3] |
| On ProvenHand | |
| Hands listed | 0 |
Henderson County Expansion Project is a natural gas pipeline in Indiana and Kentucky, operated by Texas Gas Transmission, LLC. It runs 24 miles of 20" pipe.
Inspection
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Henderson County Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP21-467”. Federal Energy Regulatory Commission. 22 April 2020. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notification of In-Service and Abandonment, Henderson County Expansion Project (CP21-467)”. Texas Gas Transmission, LLC (filed with FERC). 10 May 2024. Retrieved 4 October 2026.
- “Order Issuing Certificate and Granting Abandonment, Texas Gas Transmission, LLC, Henderson County Expansion Project (CP21-467)”. Federal Energy Regulatory Commission. 20 October 2022. Retrieved 4 October 2026.
- “Construction Inspection Report (inspection of 08/22/2023), Henderson County Expansion Project (CP21-467)”. Federal Energy Regulatory Commission. 8 September 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.